18011.001

UZ Leuven Pharmacy

In a shell building, UZ Leuven is setting up a manufacturing pharmacy that complies with the updated PIC/S guidelines.

Client

UZ Leuven

Location

49 Herestraat, 3000 Leuven

Architect

Felix & Partners

Floor Area of New Construction

5,600

Total construction cost

19,400,000 EUR, excluding VAT

Budget techniques

12,920,000 EUR, excluding VAT

‍Period ofstudy

Start Date: February 1, 2024

as of May 31, 2024

Period of implementation

Start Date: May 5, 2025

Ends 08/27/2027

For UZ Leuven, a production pharmacy with a gross floor area of 2,800 m² was constructed in a shell building, including a technical room of 2,800 m² on the floor above. The project includes GMP-certified cleanrooms (Classes B, C, and D) for sterile and non-sterile preparations, cytostatics, and clinical trials, featuring isolators, robots, and specific safety measures for toxic substances—fully compliant with the updated PIC/S guidelines through an Engineering & Build approach.

A new manufacturing pharmacy in accordance with the updated PIC/S guidelines

In a shell building, UZ Leuven is constructing a production pharmacy with a gross floor area of 2,800 m² . A technical room measuring 2,800 m² is being provided on the floor above.

This manufacturing facility must comply with the updated PIC/S guidelines, which will become legally mandatory as of January 2026. Due to the tight timeline, UZ Leuven has opted for an Engineering & Built approach.

The production pharmacy has several cleanrooms classified as GMP Class B, C, and D. The project includes numerous isolators, robots, biosafety cabinets, and powder cabinets, and since toxic substances are handled in various rooms, appropriate safety measures are required. The production pharmacy manufactures both sterile and non-sterile preparations; it features a cleanroom dedicated to cytostatic drugs, as well as cleanrooms designated for clinical trials.

Ingenium and an architect as the inspection team

Ingenium is responsible for drafting the performance specifications and quality requirements for HVAC, plumbing, gas systems, WFI (water for injection), and electrical systems. The architectural firm Felix & Partners works as a subcontractor for Ingenium and is responsible for the architectural design. During construction, Ingenium and Felix & Partners act as the inspection team on behalf of the client.

Technical Applications

  • A new cooling plant equipped with reversible heat pumps and a four-pipe heat pump
    , given that both heating and cooling will be needed simultaneously
  • Cleanrooms are ventilated using fresh air units and recirculation units—
    . Filter fan units are used.

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.

UZ Leuven Pharmacy

UZ Leuven Pharmacy

In a shell building, UZ Leuven is setting up a manufacturing pharmacy that complies with the updated PIC/S guidelines.

Client

UZ Leuven

Location

49 Herestraat, 3000 Leuven

Architect

Felix & Partners

Floor Area of New Construction

5,600

Total construction cost

19,400,000 EUR, excluding VAT

Budget techniques

12,920,000 EUR, excluding VAT

UZ Leuven Pharmacy

Oops! Something went wrong while submitting the form.