UZ Leuven Phase 7 - New Ward Building

A new "Phase 7 ward building" is planned for the Gasthuisberg campus. This 14-story high-rise will house several nursing wards, two floors of outpatient services, two floors of outpatient clinics, as well as an expansion of the radiation therapy department, an EPSI unit, a clinical pharmacology floor with an associated cleanroom, and more.

Location:

Gasthuisberg Campus, 3000 Leuven

Client:

UZ Leuven

Partnership with:

Wiegerinck, LOW, NEy

Contact person:

Jasper Wittock

Surface area:

44,000 m²

Budget techniques:

€46,000,000.00 (excluding VAT)

Total construction cost:

€136,000,000.00 (excluding VAT)

Start of studies:

February 2023

Completion of studies:

July 2026

Start of implementation:

September 2026

End of performance:

May 2030

Services
No items found.
Sectors
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building

UZ Leuven Phase 7 - New Ward Building

A new "Phase 7 ward building" is planned for the Gasthuisberg campus. This 14-story high-rise will house several nursing wards, two floors of outpatient services, two floors of outpatient clinics, as well as an expansion of the radiation therapy department, an EPSI unit, a clinical pharmacology floor with an associated cleanroom, and more.

Ingenium is designing all the technical systems in this building: HVAC, plumbing and fire protection, medical gases, pneumatic tube systems, electrical systems, and elevators. The building will also house a power plant that will supply heating and cooling not only to the building itself but also to several surrounding buildings. Ingenium is also designing that power plant. We will also oversee and monitor the execution of the technical works.

The building is intensively ventilated; to this end, various air handling units are installed on the mechanical floors on levels 13 and 91 (basement).

A base power plant, equipped with air-to-water heat pumps and connected to the existing ATES at the Gasthuisberg site, supplies both the Phase 7 building and adjacent buildings with heating and cooling; this is supplemented by a peak cooling plant with additional air-to-water heat pumps.

The building is largely heated and cooled using climate ceilings.

UZ Leuven Phase 7 - New Ward Building

UZ Leuven Phase 7 - New Ward Building

A new "Phase 7 ward building" is planned for the Gasthuisberg campus. This 14-story high-rise will house several nursing wards, two floors of outpatient services, two floors of outpatient clinics, as well as an expansion of the radiation therapy department, an EPSI unit, a clinical pharmacology floor with an associated cleanroom, and more.

Location:

Gasthuisberg Campus, 3000 Leuven

Client:

UZ Leuven

Partnership with:

Wiegerinck, LOW, NEy

Contact person:

Jasper Wittock

Surface area:

44,000 m²

Budget techniques:

€46,000,000.00 (excluding VAT)

Total construction cost:

€136,000,000.00 (excluding VAT)

Start of studies:

February 2023

Completion of studies:

July 2026

Start of implementation:

September 2026

End of performance:

May 2030

Services
No items found.
Sectors
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building

UZ Leuven Phase 7 - New Ward Building

A new "Phase 7 ward building" is planned for the Gasthuisberg campus. This 14-story high-rise will house several nursing wards, two floors of outpatient services, two floors of outpatient clinics, as well as an expansion of the radiation therapy department, an EPSI unit, a clinical pharmacology floor with an associated cleanroom, and more.

Ingenium is designing all the technical systems in this building: HVAC, plumbing and fire protection, medical gases, pneumatic tube systems, electrical systems, and elevators. The building will also house a power plant that will supply heating and cooling not only to the building itself but also to several surrounding buildings. Ingenium is also designing that power plant. We will also oversee and monitor the execution of the technical works.

The building is intensively ventilated; to this end, various air handling units are installed on the mechanical floors on levels 13 and 91 (basement).

A base power plant, equipped with air-to-water heat pumps and connected to the existing ATES at the Gasthuisberg site, supplies both the Phase 7 building and adjacent buildings with heating and cooling; this is supplemented by a peak cooling plant with additional air-to-water heat pumps.

The building is largely heated and cooled using climate ceilings.

UZ Leuven Phase 7 - New Ward Building
Oops! Something went wrong while submitting the form.
22018.001

UZ Leuven Phase 7 - New Ward Building

A new "Phase 7 ward building" is planned for the Gasthuisberg campus. This 14-story high-rise will house several nursing wards, two floors of outpatient services, two floors of outpatient clinics, as well as an expansion of the radiation therapy department, an EPSI unit, a clinical pharmacology floor with an associated cleanroom, and more.

Location:

Gasthuisberg Campus, 3000 Leuven

Client:

UZ Leuven

Partnership with:

Wiegerinck, LOW, NEy

Contact person:

Jasper Wittock

Surface area:

44,000 m²

Budget techniques:

€46,000,000.00 (excluding VAT)

Total construction cost:

€136,000,000.00 (excluding VAT)

Start of studies:

February 2023

Completion of studies:

July 2026

Start of implementation:

September 2026

End of performance:

May 2030

Services
No items found.
Sectors
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building
UZ Leuven Phase 7 - New Ward Building

UZ Leuven Phase 7 - New Ward Building

A new "Phase 7 ward building" is planned for the Gasthuisberg campus. This 14-story high-rise will house several nursing wards, two floors of outpatient services, two floors of outpatient clinics, as well as an expansion of the radiation therapy department, an EPSI unit, a clinical pharmacology floor with an associated cleanroom, and more.

Ingenium is designing all the technical systems in this building: HVAC, plumbing and fire protection, medical gases, pneumatic tube systems, electrical systems, and elevators. The building will also house a power plant that will supply heating and cooling not only to the building itself but also to several surrounding buildings. Ingenium is also designing that power plant. We will also oversee and monitor the execution of the technical works.

The building is intensively ventilated; to this end, various air handling units are installed on the mechanical floors on levels 13 and 91 (basement).

A base power plant, equipped with air-to-water heat pumps and connected to the existing ATES at the Gasthuisberg site, supplies both the Phase 7 building and adjacent buildings with heating and cooling; this is supplemented by a peak cooling plant with additional air-to-water heat pumps.

The building is largely heated and cooled using climate ceilings.

UZ Leuven Phase 7 - New Ward Building

Related projects

UZL Critical Services Phase VIII

UZL Critical Services Phase VIII
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates
In the spotlight

Framework contract UZ Brussel

Framework contract UZ Brussel
In the spotlight

Energy master plan heat and cold ZOL Genk, Campus Sint-Jan

Energy master plan heat and cold ZOL Genk, Campus Sint-Jan
In the spotlight

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Gasthuisberg Leuven - Energy plan update 2022.
In the spotlight

PVT Monastery Site Lubbeek

PVT Monastery Site Lubbeek
In the spotlight

AZ Damien Ostend energy plan