Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

Client

Universitair Ziekenhuis Gasthuisberg / KU Leuven

Location

Leuven

Budget techniques

approx. 50,000,000 € (excl. VAT)

Surface

550.000 m²

Period

2006 - 2030

Services
No items found.
Sectors
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

A master plan was developed that integrates cold-heat storage (ATES) and heat pumps into an overarching and redundant concept for cold and heat production for the entire site. The focus is on operational reliability and energy efficiency. This entire growth and renovation operation of the campus and energy infrastructure is being implemented in phases and is still ongoing.

Ingenium was responsible for drawing up the master plan at the campus level, the design and implementation supervision of the ensuing energy infrastructure projects for UZ Leuven and the monthly monitoring of progress, concept monitoring and possible concept adjustment of this master plan.

Some 30 projects have already been implemented within this master plan, including the renovation or new construction of 11 cooling and/or heating plants and 2 steam plants.  

In 2022 Ingenium, in close consultation with UZ Leuven, updated the master plan concepts to work toward a fossil-free campus by 2045. 8 new fossil-free cooling and heating plants are currently in sketch or preliminary design.

ref.06054.001

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

Client

Universitair Ziekenhuis Gasthuisberg / KU Leuven

Location

Leuven

Budget techniques

approx. 50,000,000 € (excl. VAT)

Surface

550.000 m²

Period

2006 - 2030

Services
No items found.
Sectors
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

A master plan was developed that integrates cold-heat storage (ATES) and heat pumps into an overarching and redundant concept for cold and heat production for the entire site. The focus is on operational reliability and energy efficiency. This entire growth and renovation operation of the campus and energy infrastructure is being implemented in phases and is still ongoing.

Ingenium was responsible for drawing up the master plan at the campus level, the design and implementation supervision of the ensuing energy infrastructure projects for UZ Leuven and the monthly monitoring of progress, concept monitoring and possible concept adjustment of this master plan.

Some 30 projects have already been implemented within this master plan, including the renovation or new construction of 11 cooling and/or heating plants and 2 steam plants.  

In 2022 Ingenium, in close consultation with UZ Leuven, updated the master plan concepts to work toward a fossil-free campus by 2045. 8 new fossil-free cooling and heating plants are currently in sketch or preliminary design.

ref.06054.001

Master plan Energy UZ Gasthuisberg Leuven
Oops! Something went wrong while submitting the form.

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

Client

Universitair Ziekenhuis Gasthuisberg / KU Leuven

Location

Leuven

Budget techniques

approx. 50,000,000 € (excl. VAT)

Surface

550.000 m²

Period

2006 - 2030

Services
No items found.
Sectors
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

A master plan was developed that integrates cold-heat storage (ATES) and heat pumps into an overarching and redundant concept for cold and heat production for the entire site. The focus is on operational reliability and energy efficiency. This entire growth and renovation operation of the campus and energy infrastructure is being implemented in phases and is still ongoing.

Ingenium was responsible for drawing up the master plan at the campus level, the design and implementation supervision of the ensuing energy infrastructure projects for UZ Leuven and the monthly monitoring of progress, concept monitoring and possible concept adjustment of this master plan.

Some 30 projects have already been implemented within this master plan, including the renovation or new construction of 11 cooling and/or heating plants and 2 steam plants.  

In 2022 Ingenium, in close consultation with UZ Leuven, updated the master plan concepts to work toward a fossil-free campus by 2045. 8 new fossil-free cooling and heating plants are currently in sketch or preliminary design.

ref.06054.001

Master plan Energy UZ Gasthuisberg Leuven

Related projects

The High Souls

The High Souls
In the spotlight

Antwerp University Hospital - master plan energy building

Antwerp University Hospital - master plan energy building
In the spotlight

Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno

 Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno
In the spotlight

AZ Sint Jan Bruges - new therapy pool construction

AZ Sint Jan Bruges - new therapy pool construction
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates
In the spotlight

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno
In the spotlight

Framework contract UZ Brussel

Framework contract UZ Brussel
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.