Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

Client

Universitair Ziekenhuis Gasthuisberg / KU Leuven

Location

Leuven

Budget techniques

approx. 50,000,000 € (excl. VAT)

Surface

550.000 m²

Period

2006 - 2030

Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

A master plan was developed that integrates cold-heat storage (ATES) and heat pumps into an overarching and redundant concept for cold and heat production for the entire site. The focus is on operational reliability and energy efficiency. This entire growth and renovation operation of the campus and energy infrastructure is being implemented in phases and is still ongoing.

Ingenium was responsible for drawing up the master plan at the campus level, the design and implementation supervision of the ensuing energy infrastructure projects for UZ Leuven and the monthly monitoring of progress, concept monitoring and possible concept adjustment of this master plan.

Some 30 projects have already been implemented within this master plan, including the renovation or new construction of 11 cooling and/or heating plants and 2 steam plants.  

In 2022 Ingenium, in close consultation with UZ Leuven, updated the master plan concepts to work toward a fossil-free campus by 2045. 8 new fossil-free cooling and heating plants are currently in sketch or preliminary design.

ref.06054.001

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

Client

Universitair Ziekenhuis Gasthuisberg / KU Leuven

Location

Leuven

Budget techniques

approx. 50,000,000 € (excl. VAT)

Surface

550.000 m²

Period

2006 - 2030

Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

A master plan was developed that integrates cold-heat storage (ATES) and heat pumps into an overarching and redundant concept for cold and heat production for the entire site. The focus is on operational reliability and energy efficiency. This entire growth and renovation operation of the campus and energy infrastructure is being implemented in phases and is still ongoing.

Ingenium was responsible for drawing up the master plan at the campus level, the design and implementation supervision of the ensuing energy infrastructure projects for UZ Leuven and the monthly monitoring of progress, concept monitoring and possible concept adjustment of this master plan.

Some 30 projects have already been implemented within this master plan, including the renovation or new construction of 11 cooling and/or heating plants and 2 steam plants.  

In 2022 Ingenium, in close consultation with UZ Leuven, updated the master plan concepts to work toward a fossil-free campus by 2045. 8 new fossil-free cooling and heating plants are currently in sketch or preliminary design.

ref.06054.001

Master plan Energy UZ Gasthuisberg Leuven
Oops! Something went wrong while submitting the form.

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

Client

Universitair Ziekenhuis Gasthuisberg / KU Leuven

Location

Leuven

Budget techniques

approx. 50,000,000 € (excl. VAT)

Surface

550.000 m²

Period

2006 - 2030

Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven
Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven

In 2006, UZ Leuven and KU Leuven planned a step-by-step renovation and expansion of the current energy facilities on the Gasthuisberg campus for a growth from 200,000 m² to 550,000 m².

A master plan was developed that integrates cold-heat storage (ATES) and heat pumps into an overarching and redundant concept for cold and heat production for the entire site. The focus is on operational reliability and energy efficiency. This entire growth and renovation operation of the campus and energy infrastructure is being implemented in phases and is still ongoing.

Ingenium was responsible for drawing up the master plan at the campus level, the design and implementation supervision of the ensuing energy infrastructure projects for UZ Leuven and the monthly monitoring of progress, concept monitoring and possible concept adjustment of this master plan.

Some 30 projects have already been implemented within this master plan, including the renovation or new construction of 11 cooling and/or heating plants and 2 steam plants.  

In 2022 Ingenium, in close consultation with UZ Leuven, updated the master plan concepts to work toward a fossil-free campus by 2045. 8 new fossil-free cooling and heating plants are currently in sketch or preliminary design.

ref.06054.001

Master plan Energy UZ Gasthuisberg Leuven

Related projects

UZ Leuven Phase 7 - New Ward Building

UZ Leuven Phase 7 - New Ward Building
In the spotlight

UZL Critical Services Phase VIII

UZL Critical Services Phase VIII
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates
In the spotlight

Framework contract UZ Brussel

Framework contract UZ Brussel
In the spotlight

Energy master plan heat and cold ZOL Genk, Campus Sint-Jan

Energy master plan heat and cold ZOL Genk, Campus Sint-Jan
In the spotlight

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Gasthuisberg Leuven - Energy plan update 2022.
In the spotlight

PVT Monastery Site Lubbeek

PVT Monastery Site Lubbeek
In the spotlight

AZ Damien Ostend energy plan

AZ Damien Ostend energy plan
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.