Energy audit of AZ Sint-Lucas Ghent

The AZ Sint-Lucas Ghent site is subject to the obligation to draw up an energy audit every 4 years. The energy audit must contain a list of measures that can reduce the specific energy consumption on the site. Cost-effective measures (IRR ≥ 13%) must be implemented within three years.

Client: AZ Sint-Lucas Ghent

Location: site AZ Sint-Lucas, Groenebriel 1, Ghent

Amount: EUR 20,260 (excluding VAT).

Period of implementation: 2024

Services
No items found.
Sectors
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent

In the coming decades, we face the challenge of reducing energy use and switching to renewable sources. For a site like AZ Sint-Lucas Gent, this will be a complex transition, which is why the selected measures from the audit were further framed in this broader perspective. The focus was on:  

* Making heat production more sustainable.  

* Readiness of existing buildings for sustainable technologies, by reducing energy demand and lowering heating output temperatures.

* Expansion of the PV system, to reduce the electricity consumption of it and meet legal obligations.

The first part of the audit mapped energy use (heat, cold, electricity, etc.), energy sources (heat grid, CHP, etc.) and technical installations, as a starting point for further study.

Based on site visits, a longlist of possible energy-saving measures was initially drawn up. In consultation with the technical department of AZ Sint-Lucas, this was reduced to a list of 13 measures, based on the expected energy reduction and practical feasibility. Each measure was further developed to calculate the reductions in CO2 emissions and energy vectors and to determine the profitability of the investment.

Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent

The AZ Sint-Lucas Ghent site is subject to the obligation to draw up an energy audit every 4 years. The energy audit must contain a list of measures that can reduce the specific energy consumption on the site. Cost-effective measures (IRR ≥ 13%) must be implemented within three years.

Client: AZ Sint-Lucas Ghent

Location: site AZ Sint-Lucas, Groenebriel 1, Ghent

Amount: EUR 20,260 (excluding VAT).

Period of implementation: 2024

Services
No items found.
Sectors
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent

In the coming decades, we face the challenge of reducing energy use and switching to renewable sources. For a site like AZ Sint-Lucas Gent, this will be a complex transition, which is why the selected measures from the audit were further framed in this broader perspective. The focus was on:  

* Making heat production more sustainable.  

* Readiness of existing buildings for sustainable technologies, by reducing energy demand and lowering heating output temperatures.

* Expansion of the PV system, to reduce the electricity consumption of it and meet legal obligations.

The first part of the audit mapped energy use (heat, cold, electricity, etc.), energy sources (heat grid, CHP, etc.) and technical installations, as a starting point for further study.

Based on site visits, a longlist of possible energy-saving measures was initially drawn up. In consultation with the technical department of AZ Sint-Lucas, this was reduced to a list of 13 measures, based on the expected energy reduction and practical feasibility. Each measure was further developed to calculate the reductions in CO2 emissions and energy vectors and to determine the profitability of the investment.

Energy audit of AZ Sint-Lucas Ghent
Oops! Something went wrong while submitting the form.
11004.018

Energy audit of AZ Sint-Lucas Ghent

The AZ Sint-Lucas Ghent site is subject to the obligation to draw up an energy audit every 4 years. The energy audit must contain a list of measures that can reduce the specific energy consumption on the site. Cost-effective measures (IRR ≥ 13%) must be implemented within three years.

Client: AZ Sint-Lucas Ghent

Location: site AZ Sint-Lucas, Groenebriel 1, Ghent

Amount: EUR 20,260 (excluding VAT).

Period of implementation: 2024

Services
No items found.
Sectors
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent
Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent

In the coming decades, we face the challenge of reducing energy use and switching to renewable sources. For a site like AZ Sint-Lucas Gent, this will be a complex transition, which is why the selected measures from the audit were further framed in this broader perspective. The focus was on:  

* Making heat production more sustainable.  

* Readiness of existing buildings for sustainable technologies, by reducing energy demand and lowering heating output temperatures.

* Expansion of the PV system, to reduce the electricity consumption of it and meet legal obligations.

The first part of the audit mapped energy use (heat, cold, electricity, etc.), energy sources (heat grid, CHP, etc.) and technical installations, as a starting point for further study.

Based on site visits, a longlist of possible energy-saving measures was initially drawn up. In consultation with the technical department of AZ Sint-Lucas, this was reduced to a list of 13 measures, based on the expected energy reduction and practical feasibility. Each measure was further developed to calculate the reductions in CO2 emissions and energy vectors and to determine the profitability of the investment.

Energy audit of AZ Sint-Lucas Ghent

Related projects

Antwerp University Hospital - master plan energy building

Antwerp University Hospital - master plan energy building
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno

 Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno
In the spotlight

AZ Sint Jan Bruges - new therapy pool construction

AZ Sint Jan Bruges - new therapy pool construction
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates
In the spotlight

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno
In the spotlight

Framework contract UZ Brussel

Framework contract UZ Brussel
In the spotlight

Energy master plan heat and cold ZOL Genk, Campus Sint-Jan

Energy master plan heat and cold ZOL Genk, Campus Sint-Jan
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.