UZL Critical Services Phase VIII

Construction of an expansion featuring a new building block for critical services within the Gasthuisberg UZ Leuven hospital campus. The project involves a highly technical facility equipped with state-of-the-art systems that meet strict quality and safety standards.

Client

UZ Leuven

Partnership with

TM LOW/WIEGERINCK/NEY/INGENIUM

Location

New construction

UZ Leuven Gasthuisberg, Herestraat 49, 3000 Leuven

Certification

VIPA

Surface

21,500square meters

Total construction cost

76.000.000 EUR

Budget techniques

24.250.000 EUR

Timing study

starting in June 2022

End of April 2029

Timing of implementation

Start: February 2026

End of April 2029

VOPL

April 2029

DOPL

April 2030

Copyright images

LOW architects

UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII

UZL Critical Services Phase VIII

Construction of an expansion featuring a new building block for critical services within a hospital campus. The project involves a highly technical facility equipped with state-of-the-art systems that meet strict quality and safety standards.

Program

The building includes:

  • Burn Center: 12 intensive care rooms with supporting facilities
  • 5 Intensive Care Units: each with 12 intensive care rooms
  • 1 Post-CCU unit: 12 intermediate care rooms
  • Surgical suites: 4 standard operating rooms + 2 hybrid operating rooms
  • Support areas: administrative department and technical facilities

Role of Ingenium

Ingenium has been appointed as the partner for the design of all technical systems, including:

  1. Climate Control & Ventilation
  • Reversible air-to-water heat pumps (heating and cooling generated by a separate power plant)
  • Climate ceilings for optimal comfort
  • Advanced ventilation systems with post-treatment coils in ducts for spaces with high airflow rates
  1. Plumbing and Hot Water
  • Production using residual heat from the steam system
  • Booster heat pumps for efficient heating
  1. Electrical Installations
  • New HS/LS cabin integrated into existing campus infrastructure
  • System design for critical services with maximum reliability
  1. Medical Gases
  • Complete gas systems for intensive care units and operating rooms

UZL Critical Services Phase VIII

UZL Critical Services Phase VIII

Construction of an expansion featuring a new building block for critical services within the Gasthuisberg UZ Leuven hospital campus. The project involves a highly technical facility equipped with state-of-the-art systems that meet strict quality and safety standards.

Client

UZ Leuven

Partnership with

TM LOW/WIEGERINCK/NEY/INGENIUM

Location

New construction

UZ Leuven Gasthuisberg, Herestraat 49, 3000 Leuven

Certification

VIPA

Surface

21,500square meters

Total construction cost

76.000.000 EUR

Budget techniques

24.250.000 EUR

Timing study

starting in June 2022

End of April 2029

Timing of implementation

Start: February 2026

End of April 2029

VOPL

April 2029

DOPL

April 2030

Copyright images

LOW architects

UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII

UZL Critical Services Phase VIII

Construction of an expansion featuring a new building block for critical services within a hospital campus. The project involves a highly technical facility equipped with state-of-the-art systems that meet strict quality and safety standards.

Program

The building includes:

  • Burn Center: 12 intensive care rooms with supporting facilities
  • 5 Intensive Care Units: each with 12 intensive care rooms
  • 1 Post-CCU unit: 12 intermediate care rooms
  • Surgical suites: 4 standard operating rooms + 2 hybrid operating rooms
  • Support areas: administrative department and technical facilities

Role of Ingenium

Ingenium has been appointed as the partner for the design of all technical systems, including:

  1. Climate Control & Ventilation
  • Reversible air-to-water heat pumps (heating and cooling generated by a separate power plant)
  • Climate ceilings for optimal comfort
  • Advanced ventilation systems with post-treatment coils in ducts for spaces with high airflow rates
  1. Plumbing and Hot Water
  • Production using residual heat from the steam system
  • Booster heat pumps for efficient heating
  1. Electrical Installations
  • New HS/LS cabin integrated into existing campus infrastructure
  • System design for critical services with maximum reliability
  1. Medical Gases
  • Complete gas systems for intensive care units and operating rooms

UZL Critical Services Phase VIII
Oops! Something went wrong while submitting the form.
22033.001

UZL Critical Services Phase VIII

Construction of an expansion featuring a new building block for critical services within the Gasthuisberg UZ Leuven hospital campus. The project involves a highly technical facility equipped with state-of-the-art systems that meet strict quality and safety standards.

Client

UZ Leuven

Partnership with

TM LOW/WIEGERINCK/NEY/INGENIUM

Location

New construction

UZ Leuven Gasthuisberg, Herestraat 49, 3000 Leuven

Certification

VIPA

Surface

21,500square meters

Total construction cost

76.000.000 EUR

Budget techniques

24.250.000 EUR

Timing study

starting in June 2022

End of April 2029

Timing of implementation

Start: February 2026

End of April 2029

VOPL

April 2029

DOPL

April 2030

Copyright images

LOW architects

UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII
UZL Critical Services Phase VIII

UZL Critical Services Phase VIII

Construction of an expansion featuring a new building block for critical services within a hospital campus. The project involves a highly technical facility equipped with state-of-the-art systems that meet strict quality and safety standards.

Program

The building includes:

  • Burn Center: 12 intensive care rooms with supporting facilities
  • 5 Intensive Care Units: each with 12 intensive care rooms
  • 1 Post-CCU unit: 12 intermediate care rooms
  • Surgical suites: 4 standard operating rooms + 2 hybrid operating rooms
  • Support areas: administrative department and technical facilities

Role of Ingenium

Ingenium has been appointed as the partner for the design of all technical systems, including:

  1. Climate Control & Ventilation
  • Reversible air-to-water heat pumps (heating and cooling generated by a separate power plant)
  • Climate ceilings for optimal comfort
  • Advanced ventilation systems with post-treatment coils in ducts for spaces with high airflow rates
  1. Plumbing and Hot Water
  • Production using residual heat from the steam system
  • Booster heat pumps for efficient heating
  1. Electrical Installations
  • New HS/LS cabin integrated into existing campus infrastructure
  • System design for critical services with maximum reliability
  1. Medical Gases
  • Complete gas systems for intensive care units and operating rooms

UZL Critical Services Phase VIII

Related projects

UZ Leuven Phase 7 - New Ward Building

UZ Leuven Phase 7 - New Ward Building
In the spotlight

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Energy policy City-Ghent Energy study Campus PC Dr. Guislain
In the spotlight

The Hoge Rielen

The Hoge Rielen
In the spotlight

Antwerp University Hospital - master plan energy building

Antwerp University Hospital - master plan energy building
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno

 Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno
In the spotlight

AZ Sint Jan Bruges - new therapy pool construction

AZ Sint Jan Bruges - new therapy pool construction
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.