AZ Delta - remodeling and renovation OK campus Brugsesteenweg
At AZ Delta, Brugsesteenweg campus in Roeselare, the existing operating theater (Block C) is being remodeled and expanded on level 3 (with associated new technical spaces on level+2, and remodeling of existing technical space on level +4)
AUDITOR
AZ DELTA
ARCHITECT
M4 architects
LOCATION
Roeselare
OPPORTUNITY
4.500m2
BUDGET
approx. 14,000,000 EUR (excl. VAT) total construction budget
PERIOD
study 2021-2023
works 2024-2026
AZ Delta - remodeling and renovation OK campus Brugsesteenweg
At AZ Delta, Brugsesteenweg campus in Roeselare, the existing operating theater (Block C) is being remodeled and expanded on Level 3 (with associated new technical spaces on Level +2, and remodeling of existing technical space on Level +4).
In a preliminary file, "a level 0 area (kitchen and pharmacy) is being remodeled and preparations are being made to eliminate the current technical space on the roof of the C block, without impeding activity within the existing hospital.
The expansion will accommodate up to 8 OP rooms. The existing OP quarter will be converted to a pre and post operative admission area.
Ingenium designs the complete technical systems for both new construction and renovation, with coupling to the existing central systems. Great attention is paid to the ventilation of the OP rooms from the technical space below, in order to guarantee a laminar flow and thus perfect air quality in each room. Naturally, great attention is also paid to (electrical) patient safety.
Up to PV panels are provided on the roof of the new building volume.
Ingenium also prepares the file for the medical shuttles.