AZ Sint Jan Bruges - new therapy pool construction
AZ Sint-Jan manufactures therapy pools specifically designed for rehabilitation and therapy purposes.
AUDITOR
AZ Sint-Jan Brugge
ARCHITECT
Archus
LOCATION
Ruddershove 10 , 8000 Bruges
OPPORTUNITY
Pool rooms: 310 m2 + technical room = 518 m2
PERIOD
study 2022- 2023
works 2024 - 2025
BUDGET
Amounts excluding VAT:
Budget techniques:
- HVAC: 385,004.80 EUR
- Electricity: EUR 137,680.20
- Sanitary-fire suppression: EUR 67,559.00
- Modular bath + Water treatment: EUR 894,274,00
- Total: EUR 1,84,518.00
Budget study: honorarium: 104,000.00 EUR
Total construction budget: no figures
AZ Sint-Jan is currently working on the construction of a therapy pool. Designed specifically for rehabilitation and therapy purposes, this bath will be used primarily by patients requiring physical therapy and other rehabilitation treatments. The bath will have partially adjustable depths.
Therapy pool with an adjustable floor
AZ Sint-Jan is currently working on the construction of a therapy pool. This pool is specially designed for rehabilitation and therapy purposes and will primarily be used by patients who need physical therapy and other rehabilitation treatments. Part of the pool will have an adjustable depth.

Modular Bathroom Design Techniques
The study includes the techniques of HVAC+sanitation, electricity, water treatment and the modular bath itself of the new construction therapeutic bath, where the therapy bath in stainless steel has dimensions of 9.6 m x 8.9 m, and 1/3 of the surface is equipped with a movable bottom.


Also bitten by
smart technology?
Come push boundaries with us and help make a difference in our industry-leading projects.









