AZ Sint Jan Bruges - new therapy pool construction

AZ Sint-Jan is currently working on the construction of a therapy pool. Designed specifically for rehabilitation and therapy purposes, this bath will be used primarily by patients requiring physical therapy and other rehabilitation treatments. The bath will have partially adjustable depths.

AUDITOR

AZ Sint-Jan Brugge

ARCHITECT

Archus

LOCATION

Ruddershove 10 , 8000 Bruges

‍BUDGET

Amounts excluding VAT:

Budget techniques:

  • HVAC: 385,004.80 EUR
  • Electricity: EUR 137,680.20
  • Sanitary-fire suppression: EUR 67,559.00
  • Modular bath + Water treatment: EUR 894,274,00
  • Total: EUR 1,84,518.00

Budget study: honorarium: 104,000.00 EUR

Total construction budget: no figures

OPPORTUNITY

Pool rooms: 310 m2 + technical room = 518 m2

PERIOD

study 2022- 2023

works 2024 - 2025

REF

20105.001

The study includes the techniques of HVAC+sanitation, electricity, water treatment and the modular bath itself of the new construction therapeutic bath, where the therapy bath in stainless steel has dimensions of 9.6 m x 8.9 m, and 1/3 of the surface is equipped with a movable bottom.

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.

AZ Sint Jan Bruges - new therapy pool construction

The study includes the techniques of HVAC+sanitation, electricity, water treatment and the modular bath itself of the new construction therapeutic bath, where the therapy bath in stainless steel has dimensions of 9.6 m x 8.9 m, and 1/3 of the surface is equipped with a movable bottom.

AZ Sint Jan Bruges - new therapy pool construction

AZ Sint-Jan is currently working on the construction of a therapy pool. Designed specifically for rehabilitation and therapy purposes, this bath will be used primarily by patients requiring physical therapy and other rehabilitation treatments. The bath will have partially adjustable depths.

AUDITOR

AZ Sint-Jan Brugge

ARCHITECT

Archus

LOCATION

Ruddershove 10 , 8000 Bruges

‍BUDGET

Amounts excluding VAT:

Budget techniques:

  • HVAC: 385,004.80 EUR
  • Electricity: EUR 137,680.20
  • Sanitary-fire suppression: EUR 67,559.00
  • Modular bath + Water treatment: EUR 894,274,00
  • Total: EUR 1,84,518.00

Budget study: honorarium: 104,000.00 EUR

Total construction budget: no figures

OPPORTUNITY

Pool rooms: 310 m2 + technical room = 518 m2

PERIOD

study 2022- 2023

works 2024 - 2025

REF

20105.001

AZ Sint Jan Bruges - new therapy pool construction

The study includes the techniques of HVAC+sanitation, electricity, water treatment and the modular bath itself of the new construction therapeutic bath, where the therapy bath in stainless steel has dimensions of 9.6 m x 8.9 m, and 1/3 of the surface is equipped with a movable bottom.

Oops! Something went wrong while submitting the form.