Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Commissioned by the City of Ghent and Care Group Guislain, a long-term vision was developed to heat the site fossil-free, improve indoor comfort and increase renewable energy production

Client:

City of Ghent and Care Group Guislain

Location:

Francisco Ferrerlaan 88a Ghent

Budget study:

20 625 euros excluding VAT

Period of study:

December 2024 - May 2025

Services
No items found.
Sectors
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

The Dr. Guislain Psychiatric Center campus in Ghent is a historic site with a diverse mix of old and new buildings, varying in use, age and energy performance. Current energy efficiency is low andCO2 emissions from heating are high.

Commissioned by the City of Ghent and Care Group Guislain, a long-term vision was developed to heat the site fossil-free, improve indoor comfort and increase renewable energy production. This took into account the heritage value of the buildings and the technical possibilities for, among other things, roof and wall insulation, improvement of joinery and optimization of airtightness.

The master plan examines several scenarios, including sewage heat in combination with BEO fields or air-water heat pumps, and proposes a phased sustainability of the heat grid:

1. Renovating and lowering the heating line.

2. Decoupling domestic hot water via booster heat pumps

3. Replacement of CHPs with riothermal.

4. Phasing out gas boilers in favor of air-water heat pumps

It also identified the potential for additional PV installations, amply meeting legal obligations. The study takes into account EPCNR targets, legal obligations and avoidance of lock-in effects.

The goal is to make the buildings ready for the next 50 years, with an interim step toward 2035 in which significantCO2 reductions are already being realized.

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Commissioned by the City of Ghent and Care Group Guislain, a long-term vision was developed to heat the site fossil-free, improve indoor comfort and increase renewable energy production

Client:

City of Ghent and Care Group Guislain

Location:

Francisco Ferrerlaan 88a Ghent

Budget study:

20 625 euros excluding VAT

Period of study:

December 2024 - May 2025

Services
No items found.
Sectors
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

The Dr. Guislain Psychiatric Center campus in Ghent is a historic site with a diverse mix of old and new buildings, varying in use, age and energy performance. Current energy efficiency is low andCO2 emissions from heating are high.

Commissioned by the City of Ghent and Care Group Guislain, a long-term vision was developed to heat the site fossil-free, improve indoor comfort and increase renewable energy production. This took into account the heritage value of the buildings and the technical possibilities for, among other things, roof and wall insulation, improvement of joinery and optimization of airtightness.

The master plan examines several scenarios, including sewage heat in combination with BEO fields or air-water heat pumps, and proposes a phased sustainability of the heat grid:

1. Renovating and lowering the heating line.

2. Decoupling domestic hot water via booster heat pumps

3. Replacement of CHPs with riothermal.

4. Phasing out gas boilers in favor of air-water heat pumps

It also identified the potential for additional PV installations, amply meeting legal obligations. The study takes into account EPCNR targets, legal obligations and avoidance of lock-in effects.

The goal is to make the buildings ready for the next 50 years, with an interim step toward 2035 in which significantCO2 reductions are already being realized.

Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Oops! Something went wrong while submitting the form.
23015.004

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Commissioned by the City of Ghent and Care Group Guislain, a long-term vision was developed to heat the site fossil-free, improve indoor comfort and increase renewable energy production

Client:

City of Ghent and Care Group Guislain

Location:

Francisco Ferrerlaan 88a Ghent

Budget study:

20 625 euros excluding VAT

Period of study:

December 2024 - May 2025

Services
No items found.
Sectors
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain
Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

The Dr. Guislain Psychiatric Center campus in Ghent is a historic site with a diverse mix of old and new buildings, varying in use, age and energy performance. Current energy efficiency is low andCO2 emissions from heating are high.

Commissioned by the City of Ghent and Care Group Guislain, a long-term vision was developed to heat the site fossil-free, improve indoor comfort and increase renewable energy production. This took into account the heritage value of the buildings and the technical possibilities for, among other things, roof and wall insulation, improvement of joinery and optimization of airtightness.

The master plan examines several scenarios, including sewage heat in combination with BEO fields or air-water heat pumps, and proposes a phased sustainability of the heat grid:

1. Renovating and lowering the heating line.

2. Decoupling domestic hot water via booster heat pumps

3. Replacement of CHPs with riothermal.

4. Phasing out gas boilers in favor of air-water heat pumps

It also identified the potential for additional PV installations, amply meeting legal obligations. The study takes into account EPCNR targets, legal obligations and avoidance of lock-in effects.

The goal is to make the buildings ready for the next 50 years, with an interim step toward 2035 in which significantCO2 reductions are already being realized.

Energy policy City-Ghent Energy study Campus PC Dr. Guislain

Related projects

The High Souls

The High Souls
In the spotlight

Antwerp University Hospital - master plan energy building

Antwerp University Hospital - master plan energy building
In the spotlight

Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno

 Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno
In the spotlight

AZ Sint Jan Bruges - new therapy pool construction

AZ Sint Jan Bruges - new therapy pool construction
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates
In the spotlight

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.