Electricity master plan European Parliament

One of the most complex master plans electricity.

Client

European Parliament

Budget techniques

3,940,764.17 € (excluding VAT)

Surface

500.000 m²

Period

2010 - present

Services
No items found.
Sectors
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament

Electricity master plan European Parliament

One of the most complex master plans electricity.

This is a building of approximately 300,000 m2 whose all-electric heart is being renovated and optimized in full operation.

Content:

  • Replacement of 4 high voltage cabins
  • Replacement of 21 1MVA transformers.
  • Installation of 2 additional of 1MVA
  • Adding 2 MVA of diesel power on top of the existing 3MVA of diesel power
  • Synchronization of the diesel with each other (old new)
  • Synchronization of the diesels at high voltage (i.e. it is possible to go into island with the emergency groups at reduced power)
  • SCADA package that visualizes and can automatically control diesels and high voltage
  • Integration of electrical building management system
  • Replacement of 1 MVA of UPS power
  • Bringing the installation into compliance with the new AREI 2020

Extremely special is not only the size, but also that the building should not be affected. It is not obvious to replace a high-voltage board with 23 cells without the users noticing anything. The totality of the project, with all the above works completed, is realized in the summer of 2023.

In this regard, Ingenium played an important role in the site monitoring of this project to keep the building operational during the works.

Electricity master plan European Parliament

Electricity master plan European Parliament

One of the most complex master plans electricity.

Client

European Parliament

Budget techniques

3,940,764.17 € (excluding VAT)

Surface

500.000 m²

Period

2010 - present

Services
No items found.
Sectors
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament

Electricity master plan European Parliament

One of the most complex master plans electricity.

This is a building of approximately 300,000 m2 whose all-electric heart is being renovated and optimized in full operation.

Content:

  • Replacement of 4 high voltage cabins
  • Replacement of 21 1MVA transformers.
  • Installation of 2 additional of 1MVA
  • Adding 2 MVA of diesel power on top of the existing 3MVA of diesel power
  • Synchronization of the diesel with each other (old new)
  • Synchronization of the diesels at high voltage (i.e. it is possible to go into island with the emergency groups at reduced power)
  • SCADA package that visualizes and can automatically control diesels and high voltage
  • Integration of electrical building management system
  • Replacement of 1 MVA of UPS power
  • Bringing the installation into compliance with the new AREI 2020

Extremely special is not only the size, but also that the building should not be affected. It is not obvious to replace a high-voltage board with 23 cells without the users noticing anything. The totality of the project, with all the above works completed, is realized in the summer of 2023.

In this regard, Ingenium played an important role in the site monitoring of this project to keep the building operational during the works.

Electricity master plan European Parliament
Oops! Something went wrong while submitting the form.

Electricity master plan European Parliament

One of the most complex master plans electricity.

Client

European Parliament

Budget techniques

3,940,764.17 € (excluding VAT)

Surface

500.000 m²

Period

2010 - present

Services
No items found.
Sectors
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament
Electricity master plan European Parliament

Electricity master plan European Parliament

One of the most complex master plans electricity.

This is a building of approximately 300,000 m2 whose all-electric heart is being renovated and optimized in full operation.

Content:

  • Replacement of 4 high voltage cabins
  • Replacement of 21 1MVA transformers.
  • Installation of 2 additional of 1MVA
  • Adding 2 MVA of diesel power on top of the existing 3MVA of diesel power
  • Synchronization of the diesel with each other (old new)
  • Synchronization of the diesels at high voltage (i.e. it is possible to go into island with the emergency groups at reduced power)
  • SCADA package that visualizes and can automatically control diesels and high voltage
  • Integration of electrical building management system
  • Replacement of 1 MVA of UPS power
  • Bringing the installation into compliance with the new AREI 2020

Extremely special is not only the size, but also that the building should not be affected. It is not obvious to replace a high-voltage board with 23 cells without the users noticing anything. The totality of the project, with all the above works completed, is realized in the summer of 2023.

In this regard, Ingenium played an important role in the site monitoring of this project to keep the building operational during the works.

Electricity master plan European Parliament

Related projects

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Project ACCESS: Parking Keerdok City of Mechelen

Project ACCESS: Parking Keerdok City of Mechelen
In the spotlight

PIDPA energy audit headquarters Antwerp

PIDPA energy audit headquarters Antwerp
In the spotlight

Imoya office building - simulation comfort

Imoya office building - simulation comfort
In the spotlight

RC VLO Renewal GBS Flemish Parliament

RC VLO Renewal GBS Flemish Parliament
In the spotlight

Elise Naval School Ostend

Elise Naval School Ostend
In the spotlight

Cogeneration VAC Hasselt

Cogeneration VAC Hasselt
In the spotlight

Robiano Castle - SAS institute

Robiano Castle - SAS institute
In the spotlight

Fedris - Renovation of primary infrastructure.

Fedris - Renovation of primary infrastructure.
In the spotlight

UZ Gasthuisberg Leuven - Administration Studies Turquoise

UZ Gasthuisberg Leuven - Administration Studies Turquoise
In the spotlight

Senate - Renovate boiler room and integrate CHP

Senate - Renovate boiler room and integrate CHP
In the spotlight

Framework contract PV Flemish Government

Framework contract PV Flemish Government
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.