Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Client

Bayer

Designer / Architect

Schellen Architecten bvba

Location

Diegem

Budget techniques

approx. 4,900,000 € excl. VAT

Surface

10.000 m²

Period

2007 - 2009

Services
No items found.
Sectors
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Ingenium designed all technical systems for this new office building. There was a strong focus on applying energy-efficient techniques in an already well-insulated building with high-performance sun blinds. The basic heating and cooling of the building is provided by concrete core activation. The necessary heat and cold are created by means of Borehole Energy Storage in combination with a heat pump. In addition, ground-air heat exchangers that condition the ventilation air were also provided.

By applying this total concept, the primary energy consumption for cooling and heating of the building will be reduced by about 50 %, resulting in an annual minus emission of 86 tons of CO2. A K-level of 35 and an E-level of 63 were achieved. The building won the 2009 Belgian Energy Prize for non-residential buildings (Royal Federation of Architects' Associations of Belgium).

Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Client

Bayer

Designer / Architect

Schellen Architecten bvba

Location

Diegem

Budget techniques

approx. 4,900,000 € excl. VAT

Surface

10.000 m²

Period

2007 - 2009

Services
No items found.
Sectors
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Ingenium designed all technical systems for this new office building. There was a strong focus on applying energy-efficient techniques in an already well-insulated building with high-performance sun blinds. The basic heating and cooling of the building is provided by concrete core activation. The necessary heat and cold are created by means of Borehole Energy Storage in combination with a heat pump. In addition, ground-air heat exchangers that condition the ventilation air were also provided.

By applying this total concept, the primary energy consumption for cooling and heating of the building will be reduced by about 50 %, resulting in an annual minus emission of 86 tons of CO2. A K-level of 35 and an E-level of 63 were achieved. The building won the 2009 Belgian Energy Prize for non-residential buildings (Royal Federation of Architects' Associations of Belgium).

Bayer - New construction offices Diegem
Oops! Something went wrong while submitting the form.

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Client

Bayer

Designer / Architect

Schellen Architecten bvba

Location

Diegem

Budget techniques

approx. 4,900,000 € excl. VAT

Surface

10.000 m²

Period

2007 - 2009

Services
No items found.
Sectors
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Ingenium designed all technical systems for this new office building. There was a strong focus on applying energy-efficient techniques in an already well-insulated building with high-performance sun blinds. The basic heating and cooling of the building is provided by concrete core activation. The necessary heat and cold are created by means of Borehole Energy Storage in combination with a heat pump. In addition, ground-air heat exchangers that condition the ventilation air were also provided.

By applying this total concept, the primary energy consumption for cooling and heating of the building will be reduced by about 50 %, resulting in an annual minus emission of 86 tons of CO2. A K-level of 35 and an E-level of 63 were achieved. The building won the 2009 Belgian Energy Prize for non-residential buildings (Royal Federation of Architects' Associations of Belgium).

Bayer - New construction offices Diegem

Related projects

Expansion of Callens office building

Expansion of Callens office building
In the spotlight

Vandemoortele Food Experience Center

Vandemoortele Food Experience Center
In the spotlight

Carbon roadmap for 8 existing buildings managed by Banimmo/Patronale Life

Carbon roadmap for 8 existing buildings managed by Banimmo/Patronale Life
In the spotlight

FPS Care Galilée Brussels

FPS Care Galilée Brussels
In the spotlight

Replacement of the building management system at Consciencegebouwe

Replacement of the building management system at Consciencegebouwe
In the spotlight

Hermes 7 - BREEAM Phase 1

Hermes 7 - BREEAM Phase 1
In the spotlight

Improving the user experience at Credendo Bank’s headquarters in Brussels

Improving the user experience at Credendo Bank’s headquarters in Brussels
In the spotlight

BNP renovation building AB

BNP renovation building AB
In the spotlight

AG Insurance 'Reinvent the workplace'

AG Insurance 'Reinvent the workplace'
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Project ACCESS: Parking Keerdok City of Mechelen

Project ACCESS: Parking Keerdok City of Mechelen
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.