Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Client

Bayer

Designer / Architect

Schellen Architecten bvba

Location

Diegem

Budget techniques

approx. 4,900,000 € excl. VAT

Surface

10.000 m²

Period

2007 - 2009

Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Ingenium designed all technical systems for this new office building. There was a strong focus on applying energy-efficient techniques in an already well-insulated building with high-performance sun blinds. The basic heating and cooling of the building is provided by concrete core activation. The necessary heat and cold are created by means of Borehole Energy Storage in combination with a heat pump. In addition, ground-air heat exchangers that condition the ventilation air were also provided.

By applying this total concept, the primary energy consumption for cooling and heating of the building will be reduced by about 50 %, resulting in an annual minus emission of 86 tons of CO2. A K-level of 35 and an E-level of 63 were achieved. The building won the 2009 Belgian Energy Prize for non-residential buildings (Royal Federation of Architects' Associations of Belgium).

Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Client

Bayer

Designer / Architect

Schellen Architecten bvba

Location

Diegem

Budget techniques

approx. 4,900,000 € excl. VAT

Surface

10.000 m²

Period

2007 - 2009

Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Ingenium designed all technical systems for this new office building. There was a strong focus on applying energy-efficient techniques in an already well-insulated building with high-performance sun blinds. The basic heating and cooling of the building is provided by concrete core activation. The necessary heat and cold are created by means of Borehole Energy Storage in combination with a heat pump. In addition, ground-air heat exchangers that condition the ventilation air were also provided.

By applying this total concept, the primary energy consumption for cooling and heating of the building will be reduced by about 50 %, resulting in an annual minus emission of 86 tons of CO2. A K-level of 35 and an E-level of 63 were achieved. The building won the 2009 Belgian Energy Prize for non-residential buildings (Royal Federation of Architects' Associations of Belgium).

Bayer - New construction offices Diegem
Oops! Something went wrong while submitting the form.

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Client

Bayer

Designer / Architect

Schellen Architecten bvba

Location

Diegem

Budget techniques

approx. 4,900,000 € excl. VAT

Surface

10.000 m²

Period

2007 - 2009

Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem
Bayer - New construction offices Diegem

Bayer - New construction offices Diegem

In Diegem, Bayer realized a new office building. For this prestigious building, in terms of technical installations, the aim was to achieve maximum integration of energy-efficient technologies in an innovative overall concept.

Ingenium designed all technical systems for this new office building. There was a strong focus on applying energy-efficient techniques in an already well-insulated building with high-performance sun blinds. The basic heating and cooling of the building is provided by concrete core activation. The necessary heat and cold are created by means of Borehole Energy Storage in combination with a heat pump. In addition, ground-air heat exchangers that condition the ventilation air were also provided.

By applying this total concept, the primary energy consumption for cooling and heating of the building will be reduced by about 50 %, resulting in an annual minus emission of 86 tons of CO2. A K-level of 35 and an E-level of 63 were achieved. The building won the 2009 Belgian Energy Prize for non-residential buildings (Royal Federation of Architects' Associations of Belgium).

Bayer - New construction offices Diegem

Related projects

Green Energy Park

Green Energy Park
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

Renovation of cooling plant lab building Zwijnaarde

Renovation of cooling plant lab building Zwijnaarde
In the spotlight

Framework contract UZ Brussel

Framework contract UZ Brussel
In the spotlight

Project ACCESS: Parking Keerdok City of Mechelen

Project ACCESS: Parking Keerdok City of Mechelen
In the spotlight

Rezoning monastery visitation Kraainem

Rezoning monastery visitation Kraainem
In the spotlight

AZ Sint-Jan: Mortuary renovation

AZ Sint-Jan: Mortuary renovation
In the spotlight

AZ Sint-Jan: Renovation orthopedics

AZ Sint-Jan: Renovation orthopedics
In the spotlight

AZ Sint-Jan: Renovation lab

AZ Sint-Jan: Renovation lab
In the spotlight

UZ Gasthuisberg Leuven - Power station O&N4

UZ Gasthuisberg Leuven - Power station O&N4
In the spotlight

UZ Brussel Laboratory of genetics

UZ Brussel Laboratory of genetics
In the spotlight

Also bitten by
smart technology?

Join us to push boundaries and help make a difference in our industry-leading projects.