AZ Sint-Jozef Malle - MRI expansion.

AZ St-Jozef Malle realized the commissioning of a new MRI 3T in 2016.

Client

AZ Sint-Jozef Malle

Emmaus asbl

Designer / Architect

AAPROG architects bvba

Location

Malle

Budget techniques

470,000 € excluding VAT

Surface

330 m²

Period Study

2015

Period Implementation

2015 - 2016

Services
No items found.
Sectors
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.

AZ Sint-Jozef Malle - MRI expansion.

AZ St-Jozef Malle realized the commissioning of a new MRI 3T in 2016.

‍Ingeniumwas responsible for the study and follow-up of the techniques as well as the EPB reporting. The MRI room, with control room, technical room, bed guard and protocol room were realized in an extension to the existing hospital.

Ingenium was responsible for the study, design and follow-up of the execution of the HVAC, sanitary facilities, medical gases and electricity plots. This involved strict timing in consultation with the client, the architects of AAPROG and GE as supplier of the equipment.

AZ Sint-Jozef Malle - MRI expansion.

AZ Sint-Jozef Malle - MRI expansion.

AZ St-Jozef Malle realized the commissioning of a new MRI 3T in 2016.

Client

AZ Sint-Jozef Malle

Emmaus asbl

Designer / Architect

AAPROG architects bvba

Location

Malle

Budget techniques

470,000 € excluding VAT

Surface

330 m²

Period Study

2015

Period Implementation

2015 - 2016

Services
No items found.
Sectors
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.

AZ Sint-Jozef Malle - MRI expansion.

AZ St-Jozef Malle realized the commissioning of a new MRI 3T in 2016.

‍Ingeniumwas responsible for the study and follow-up of the techniques as well as the EPB reporting. The MRI room, with control room, technical room, bed guard and protocol room were realized in an extension to the existing hospital.

Ingenium was responsible for the study, design and follow-up of the execution of the HVAC, sanitary facilities, medical gases and electricity plots. This involved strict timing in consultation with the client, the architects of AAPROG and GE as supplier of the equipment.

AZ Sint-Jozef Malle - MRI expansion.
Oops! Something went wrong while submitting the form.

AZ Sint-Jozef Malle - MRI expansion.

AZ St-Jozef Malle realized the commissioning of a new MRI 3T in 2016.

Client

AZ Sint-Jozef Malle

Emmaus asbl

Designer / Architect

AAPROG architects bvba

Location

Malle

Budget techniques

470,000 € excluding VAT

Surface

330 m²

Period Study

2015

Period Implementation

2015 - 2016

Services
No items found.
Sectors
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.
AZ Sint-Jozef Malle - MRI expansion.

AZ Sint-Jozef Malle - MRI expansion.

AZ St-Jozef Malle realized the commissioning of a new MRI 3T in 2016.

‍Ingeniumwas responsible for the study and follow-up of the techniques as well as the EPB reporting. The MRI room, with control room, technical room, bed guard and protocol room were realized in an extension to the existing hospital.

Ingenium was responsible for the study, design and follow-up of the execution of the HVAC, sanitary facilities, medical gases and electricity plots. This involved strict timing in consultation with the client, the architects of AAPROG and GE as supplier of the equipment.

AZ Sint-Jozef Malle - MRI expansion.

Related projects

The High Souls

The High Souls
In the spotlight

Antwerp University Hospital - master plan energy building

Antwerp University Hospital - master plan energy building
In the spotlight

Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno

 Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno
In the spotlight

AZ Sint Jan Bruges - new therapy pool construction

AZ Sint Jan Bruges - new therapy pool construction
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates
In the spotlight

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.