ECS/ 2XL High-rise 2

A fully automated high-bay warehouse measuring over 40 meters high and offering 76,000 pallet spaces was built in the Maritime Logistics Zone in Zeebrugge's inner harbor. The necessary loading and unloading areas were also provided, as well as a small office building.

Client:

ECS 2XL - HQ Zeebrugge

Architect/designer:

Dugardyn

Location:

Zeebrugge

Budget techniques:

3,500,000 EUR (excluding VAT) / total construction cost: 40,000,000 EUR (excluding VAT)

Period of study:

January 2021 - May 2021

Implementation period:

August 2021 - March 2023

Services
No items found.
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2

ECS/ 2XL High-rise 2

After the completion of an initial high-rise building with 36,000 pallet spaces, Ingenium was called in again to study special techniques for high-rise building 2.

In the Maritime Logistics Zone in Zeebrugge's inner harbor, a second fully automated high-bay warehouse over 40 meters high was built with 76,000 pallet spaces. The necessary loading and unloading areas were also provided, and there is even a rail connection so that trains can be loaded and unloaded. A small office building was also constructed.

We worked out the Lot sprinkler system in detail so that the necessary recesses were provided in the prefabricated racks to install all the sprinkler pipes, because no further drilling was allowed in the structure afterwards. The aspiration system was also worked out in detail.

For the electricity supply, the design was made from high voltage to low voltage, and an emergency power generator is provided for the total power, so the site can remain fully operational if the Fluvius grid is down.

ECS/ 2XL High-rise 2

ECS/ 2XL High-rise 2

A fully automated high-bay warehouse measuring over 40 meters high and offering 76,000 pallet spaces was built in the Maritime Logistics Zone in Zeebrugge's inner harbor. The necessary loading and unloading areas were also provided, as well as a small office building.

Client:

ECS 2XL - HQ Zeebrugge

Architect/designer:

Dugardyn

Location:

Zeebrugge

Budget techniques:

3,500,000 EUR (excluding VAT) / total construction cost: 40,000,000 EUR (excluding VAT)

Period of study:

January 2021 - May 2021

Implementation period:

August 2021 - March 2023

Services
No items found.
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2

ECS/ 2XL High-rise 2

After the completion of an initial high-rise building with 36,000 pallet spaces, Ingenium was called in again to study special techniques for high-rise building 2.

In the Maritime Logistics Zone in Zeebrugge's inner harbor, a second fully automated high-bay warehouse over 40 meters high was built with 76,000 pallet spaces. The necessary loading and unloading areas were also provided, and there is even a rail connection so that trains can be loaded and unloaded. A small office building was also constructed.

We worked out the Lot sprinkler system in detail so that the necessary recesses were provided in the prefabricated racks to install all the sprinkler pipes, because no further drilling was allowed in the structure afterwards. The aspiration system was also worked out in detail.

For the electricity supply, the design was made from high voltage to low voltage, and an emergency power generator is provided for the total power, so the site can remain fully operational if the Fluvius grid is down.

ECS/ 2XL High-rise 2
Oops! Something went wrong while submitting the form.

ECS/ 2XL High-rise 2

A fully automated high-bay warehouse measuring over 40 meters high and offering 76,000 pallet spaces was built in the Maritime Logistics Zone in Zeebrugge's inner harbor. The necessary loading and unloading areas were also provided, as well as a small office building.

Client:

ECS 2XL - HQ Zeebrugge

Architect/designer:

Dugardyn

Location:

Zeebrugge

Budget techniques:

3,500,000 EUR (excluding VAT) / total construction cost: 40,000,000 EUR (excluding VAT)

Period of study:

January 2021 - May 2021

Implementation period:

August 2021 - March 2023

Services
No items found.
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2
ECS/ 2XL High-rise 2

ECS/ 2XL High-rise 2

After the completion of an initial high-rise building with 36,000 pallet spaces, Ingenium was called in again to study special techniques for high-rise building 2.

In the Maritime Logistics Zone in Zeebrugge's inner harbor, a second fully automated high-bay warehouse over 40 meters high was built with 76,000 pallet spaces. The necessary loading and unloading areas were also provided, and there is even a rail connection so that trains can be loaded and unloaded. A small office building was also constructed.

We worked out the Lot sprinkler system in detail so that the necessary recesses were provided in the prefabricated racks to install all the sprinkler pipes, because no further drilling was allowed in the structure afterwards. The aspiration system was also worked out in detail.

For the electricity supply, the design was made from high voltage to low voltage, and an emergency power generator is provided for the total power, so the site can remain fully operational if the Fluvius grid is down.

ECS/ 2XL High-rise 2

Related projects

High Voltage 150 kV GIS + 22 kV MV

High Voltage 150 kV GIS + 22 kV MV
In the spotlight

High voltage 2x 150 kV/13 kV - AIS + 2x AIS 380 kV/150 kV

High voltage 2x 150 kV/13 kV - AIS + 2x AIS 380 kV/150 kV
In the spotlight

High-voltage preliminary design 150 kVA / 36 kV

High-voltage  preliminary design 150 kVA / 36 kV
In the spotlight

Preliminary design for a 36 kV high-voltage connection

Preliminary design for a 36 kV high-voltage connection
In the spotlight

36 kV high-voltage substation, 2 × 40 MVA

36 kV high-voltage substation, 2 × 40 MVA
In the spotlight

High-voltage feasibility study for 150 kV (Hitachi + Siemens)

High-voltage feasibility study for 150 kV (Hitachi + Siemens)
In the spotlight

High-voltage preliminary design for a 36 kV connection and pre-design layout

High-voltage preliminary design for a 36 kV connection and pre-design layout
In the spotlight

Preliminary design for a 36 kV high-voltage substation

Preliminary design for a 36 kV high-voltage substation
In the spotlight

Van der Vlist Zeebrugge

Van der Vlist Zeebrugge
In the spotlight

Zeebrugge Green Logistics

Zeebrugge Green Logistics
In the spotlight

DEMATRA HIGH-RISE WAREHOUSE

DEMATRA HIGH-RISE WAREHOUSE
In the spotlight

SEW Eurodrive - new warehouses and offices

SEW Eurodrive - new warehouses and offices
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.