ZEEBRUGGE GREEN LOGISTICS

A 30-hectare service and distribution park was built in the Maritime Logistics Zone in the Zeebrugge inner port. The project was designed by the team DEVI (a partnership with the following partners: Dugardyn, Establis, Verhaeghe and Industrium/Ingenium

Client:
Intervest Offices & Warehouses

Contact:
‍Stijn
Van den Abbeele

Location:
Zeebrugge

Surface area:
80,000m2

Budget construction cost:

total: approx. 41,000,000 EUR excluding VAT and fees

proportion of techniques

HVAC EUR 4mio

Electricity 5 mio EUR

Plumbing 0.5 mio EUR

Sprinkler 1.7 mio EUR

Timing study: 03/2019-03/2020

Timing of implementation: 09/2021 -11/2022

Services
No items found.
Sectors
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS

ZEEBRUGGE GREEN LOGISTICS

A 30-hectare service and distribution park was built in the Maritime Logistics Zone in the Zeebrugge inner port. Completion took place on October 12, 2022. This project was started by the Chinese group Lingang, but has in the meantime been taken over by Intervest Offices & Warehouses. In addition to the 10 halls of over 7,500m² each, with 10 loading docks, the project also includes a container yard, a central office building and ample parking for trailers and cars. In addition to the size of the project, the BREEAM Excellent score that the client and construction partners wanted to achieve stands out.

The site was developed as a European hub to serve various exporters and importers in both directions. The warehouses will serve for intermediate and transshipment as well as additional services such as inspection of goods. Each hall is 12 meters high and can store up to 8,600 pallets. 300 m of office space is also provided in each case. A main building was erected at the front of the site.

During the project, the Belgian investment group Intervest Offices & Warehouses took over this project from Lingang and it was decided to air-condition the warehouses as well. This was also gasless realized by means of 10 heat pumps of 320kW - 1 per warehouse - on the roof.

PROJECT TEAM DEVI
Behind the realization of the project was the partnership DEVI in which several local specialists work together: Architectenbureau Dugardyn, Establis (stability), Studiebureau Verhaeghe & partners and Ingenium Group, specialized in the engineering and energy efficiency of buildings for industry, logistics and retail. The partnership offers the advantage that the client had only one coordinated point of contact for all aspects of the project.

HIGH SUSTAINABILITY ISSUES
Because Lingang wanted to persuade top companies to locate in Zeebrugge, the sustainability bar was set particularly high for a logistics project. The project was not allowed to have a negative impact on the fauna and flora of the region. A score of at least 70 percent on the various BREEAM parameters was therefore targeted, resulting in the label "Excellent". Additional planting on the site and green roofs on the offices are also part of this story.

SAFETY & SECURITY

No natural gas will be consumed on the site. PV panels occupy the entire surface of the warehouse roofs and power the heat pumps and EV-charging systems. The transformers are amply dimensioned for this with a total power of 8 megawatts. The mission-critical installations and security are supplied with power via emergency generators. From the Safety Management System, all security and safety techniques are centralized and controlled. This includes : the CCTV -mobile vandal-proof cameras and intrusion protection and access control. For fire safety, a water buffer of 720 m3 was provided. In case of emergency, 2 pumps, each with a flow rate of 10,000 liters per minute (!), come into operation. An underground loop was also installed around the building for water supplies and to replenish the sprinkler supply. Finally, the site was equipped with a fiber optic network for a smooth data flow of counters and cameras, among other things.

camera stand Ling input

ZEEBRUGGE GREEN LOGISTICS

ZEEBRUGGE GREEN LOGISTICS

A 30-hectare service and distribution park was built in the Maritime Logistics Zone in the Zeebrugge inner port. The project was designed by the team DEVI (a partnership with the following partners: Dugardyn, Establis, Verhaeghe and Industrium/Ingenium

Client:
Intervest Offices & Warehouses

Contact:
‍Stijn
Van den Abbeele

Location:
Zeebrugge

Surface area:
80,000m2

Budget construction cost:

total: approx. 41,000,000 EUR excluding VAT and fees

proportion of techniques

HVAC EUR 4mio

Electricity 5 mio EUR

Plumbing 0.5 mio EUR

Sprinkler 1.7 mio EUR

Timing study: 03/2019-03/2020

Timing of implementation: 09/2021 -11/2022

Services
No items found.
Sectors
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS

ZEEBRUGGE GREEN LOGISTICS

A 30-hectare service and distribution park was built in the Maritime Logistics Zone in the Zeebrugge inner port. Completion took place on October 12, 2022. This project was started by the Chinese group Lingang, but has in the meantime been taken over by Intervest Offices & Warehouses. In addition to the 10 halls of over 7,500m² each, with 10 loading docks, the project also includes a container yard, a central office building and ample parking for trailers and cars. In addition to the size of the project, the BREEAM Excellent score that the client and construction partners wanted to achieve stands out.

The site was developed as a European hub to serve various exporters and importers in both directions. The warehouses will serve for intermediate and transshipment as well as additional services such as inspection of goods. Each hall is 12 meters high and can store up to 8,600 pallets. 300 m of office space is also provided in each case. A main building was erected at the front of the site.

During the project, the Belgian investment group Intervest Offices & Warehouses took over this project from Lingang and it was decided to air-condition the warehouses as well. This was also gasless realized by means of 10 heat pumps of 320kW - 1 per warehouse - on the roof.

PROJECT TEAM DEVI
Behind the realization of the project was the partnership DEVI in which several local specialists work together: Architectenbureau Dugardyn, Establis (stability), Studiebureau Verhaeghe & partners and Ingenium Group, specialized in the engineering and energy efficiency of buildings for industry, logistics and retail. The partnership offers the advantage that the client had only one coordinated point of contact for all aspects of the project.

HIGH SUSTAINABILITY ISSUES
Because Lingang wanted to persuade top companies to locate in Zeebrugge, the sustainability bar was set particularly high for a logistics project. The project was not allowed to have a negative impact on the fauna and flora of the region. A score of at least 70 percent on the various BREEAM parameters was therefore targeted, resulting in the label "Excellent". Additional planting on the site and green roofs on the offices are also part of this story.

SAFETY & SECURITY

No natural gas will be consumed on the site. PV panels occupy the entire surface of the warehouse roofs and power the heat pumps and EV-charging systems. The transformers are amply dimensioned for this with a total power of 8 megawatts. The mission-critical installations and security are supplied with power via emergency generators. From the Safety Management System, all security and safety techniques are centralized and controlled. This includes : the CCTV -mobile vandal-proof cameras and intrusion protection and access control. For fire safety, a water buffer of 720 m3 was provided. In case of emergency, 2 pumps, each with a flow rate of 10,000 liters per minute (!), come into operation. An underground loop was also installed around the building for water supplies and to replenish the sprinkler supply. Finally, the site was equipped with a fiber optic network for a smooth data flow of counters and cameras, among other things.

camera stand Ling input

ZEEBRUGGE GREEN LOGISTICS
Oops! Something went wrong while submitting the form.

ZEEBRUGGE GREEN LOGISTICS

A 30-hectare service and distribution park was built in the Maritime Logistics Zone in the Zeebrugge inner port. The project was designed by the team DEVI (a partnership with the following partners: Dugardyn, Establis, Verhaeghe and Industrium/Ingenium

Client:
Intervest Offices & Warehouses

Contact:
‍Stijn
Van den Abbeele

Location:
Zeebrugge

Surface area:
80,000m2

Budget construction cost:

total: approx. 41,000,000 EUR excluding VAT and fees

proportion of techniques

HVAC EUR 4mio

Electricity 5 mio EUR

Plumbing 0.5 mio EUR

Sprinkler 1.7 mio EUR

Timing study: 03/2019-03/2020

Timing of implementation: 09/2021 -11/2022

Services
No items found.
Sectors
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS
ZEEBRUGGE GREEN LOGISTICS

ZEEBRUGGE GREEN LOGISTICS

A 30-hectare service and distribution park was built in the Maritime Logistics Zone in the Zeebrugge inner port. Completion took place on October 12, 2022. This project was started by the Chinese group Lingang, but has in the meantime been taken over by Intervest Offices & Warehouses. In addition to the 10 halls of over 7,500m² each, with 10 loading docks, the project also includes a container yard, a central office building and ample parking for trailers and cars. In addition to the size of the project, the BREEAM Excellent score that the client and construction partners wanted to achieve stands out.

The site was developed as a European hub to serve various exporters and importers in both directions. The warehouses will serve for intermediate and transshipment as well as additional services such as inspection of goods. Each hall is 12 meters high and can store up to 8,600 pallets. 300 m of office space is also provided in each case. A main building was erected at the front of the site.

During the project, the Belgian investment group Intervest Offices & Warehouses took over this project from Lingang and it was decided to air-condition the warehouses as well. This was also gasless realized by means of 10 heat pumps of 320kW - 1 per warehouse - on the roof.

PROJECT TEAM DEVI
Behind the realization of the project was the partnership DEVI in which several local specialists work together: Architectenbureau Dugardyn, Establis (stability), Studiebureau Verhaeghe & partners and Ingenium Group, specialized in the engineering and energy efficiency of buildings for industry, logistics and retail. The partnership offers the advantage that the client had only one coordinated point of contact for all aspects of the project.

HIGH SUSTAINABILITY ISSUES
Because Lingang wanted to persuade top companies to locate in Zeebrugge, the sustainability bar was set particularly high for a logistics project. The project was not allowed to have a negative impact on the fauna and flora of the region. A score of at least 70 percent on the various BREEAM parameters was therefore targeted, resulting in the label "Excellent". Additional planting on the site and green roofs on the offices are also part of this story.

SAFETY & SECURITY

No natural gas will be consumed on the site. PV panels occupy the entire surface of the warehouse roofs and power the heat pumps and EV-charging systems. The transformers are amply dimensioned for this with a total power of 8 megawatts. The mission-critical installations and security are supplied with power via emergency generators. From the Safety Management System, all security and safety techniques are centralized and controlled. This includes : the CCTV -mobile vandal-proof cameras and intrusion protection and access control. For fire safety, a water buffer of 720 m3 was provided. In case of emergency, 2 pumps, each with a flow rate of 10,000 liters per minute (!), come into operation. An underground loop was also installed around the building for water supplies and to replenish the sprinkler supply. Finally, the site was equipped with a fiber optic network for a smooth data flow of counters and cameras, among other things.

camera stand Ling input

ZEEBRUGGE GREEN LOGISTICS

Related projects

MOWI Bruges Energy Audit

MOWI Bruges Energy Audit
In the spotlight

AGP Zwijnaarde - Energy plan 2024 - 2028

AGP Zwijnaarde - Energy plan 2024 - 2028
In the spotlight

IVAGO waste heat valorization and feasibility study heat and steam network

IVAGO waste heat valorization and feasibility study heat and steam network
In the spotlight

Royal FrieslandCampina charging infrastructure

Royal FrieslandCampina charging infrastructure
In the spotlight

Soudal energy plan

Soudal energy plan
In the spotlight

2XL HOOGBOUW

2XL HOOGBOUW
In the spotlight

DEMATRA HIGH-RISE WAREHOUSE

DEMATRA HIGH-RISE WAREHOUSE
In the spotlight

waste incineration plant UVE Virginal

waste incineration plant UVE Virginal
In the spotlight

La Lorraine Erpe Mere energy study phase 3

La Lorraine Erpe Mere energy study phase 3
In the spotlight

Shipyard EDR Antwerp

Shipyard EDR Antwerp
In the spotlight

FrieslandCampina Energy study PET line 2

FrieslandCampina Energy study PET line 2
In the spotlight

Fides Petfood - Energy Study.

Fides Petfood - Energy Study.
In the spotlight

Also bitten by
smart technology?