DBFM Fire Cross avenue passive school

In a Design & Build formula, the construction team Denys nv and BURO II & ARCHI I designed and built a sustainable school building in Neder-over-Beek. Ingenium designed all technical equipment and provided energy advice and dynamic simulations.

Client

Brussels City Council

‍Designer/Architect

BUROII & ARCHI I

‍Location

Neder-Over-Heembeek (Brussels)

Total construction cost

12,500,000 € excluding VAT

‍Budgettechniques

2,700,000 € excluding VAT

‍Surface.

9300 m²

Period Study

2015-09 - 2016-04

‍PeriodImplementation

2016-05 - 2018-08

Services
No items found.
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school

DBFM Fire Cross avenue passive school

In a Design & Build formula, the construction team Denys nv and BURO II & ARCHI I designed and built a sustainable school building in Neder-over-Beek. Ingenium designed all technical equipment and provided energy advice and dynamic simulations.

The site includes a school for over 300 preschoolers and a school for just under 600 elementary school students, each with its own janitor's house and refectory, but with a common kitchen and gymnasium. The latter will also be open to local residents. Building owner the City of Brussels opted for a Design & Build formula, involving the main contractor and subcontractors early on in the project. Because the city's climate requirements were stringent, Ingenium opted for a passive school concept. The high airtightness of the building, a BTES with heat pump, system D ventilation, triple glazing, thorough insulation in the exterior walls and a green roof ensure optimum control of the indoor climate. Overheating was a particular concern. The indoor temperature is allowed to exceed 25 degrees for no more than 5 percent of the annual usage time. Ingenium provided blinds on the 3 solar sides. Instead of exterior screens, roof overhangs and wooden slats on the windows were chosen. Dynamic simulations for the most critical classrooms determined the number of slats, which provide the ideal balance between adequate light and efficient shading.

The long heat period during the past July month showed that the choices made were also working effectively. The contractor, who was still finishing the building, could testify that the indoor temperature was very pleasant. Colleagues of his who were working on other construction sites even visited the school in the avenue of the Fire Cross to keep their heads cool during their consultation meetings...

ref. 15052.001

DBFM Fire Cross avenue passive school

DBFM Fire Cross avenue passive school

In a Design & Build formula, the construction team Denys nv and BURO II & ARCHI I designed and built a sustainable school building in Neder-over-Beek. Ingenium designed all technical equipment and provided energy advice and dynamic simulations.

Client

Brussels City Council

‍Designer/Architect

BUROII & ARCHI I

‍Location

Neder-Over-Heembeek (Brussels)

Total construction cost

12,500,000 € excluding VAT

‍Budgettechniques

2,700,000 € excluding VAT

‍Surface.

9300 m²

Period Study

2015-09 - 2016-04

‍PeriodImplementation

2016-05 - 2018-08

Services
No items found.
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school

DBFM Fire Cross avenue passive school

In a Design & Build formula, the construction team Denys nv and BURO II & ARCHI I designed and built a sustainable school building in Neder-over-Beek. Ingenium designed all technical equipment and provided energy advice and dynamic simulations.

The site includes a school for over 300 preschoolers and a school for just under 600 elementary school students, each with its own janitor's house and refectory, but with a common kitchen and gymnasium. The latter will also be open to local residents. Building owner the City of Brussels opted for a Design & Build formula, involving the main contractor and subcontractors early on in the project. Because the city's climate requirements were stringent, Ingenium opted for a passive school concept. The high airtightness of the building, a BTES with heat pump, system D ventilation, triple glazing, thorough insulation in the exterior walls and a green roof ensure optimum control of the indoor climate. Overheating was a particular concern. The indoor temperature is allowed to exceed 25 degrees for no more than 5 percent of the annual usage time. Ingenium provided blinds on the 3 solar sides. Instead of exterior screens, roof overhangs and wooden slats on the windows were chosen. Dynamic simulations for the most critical classrooms determined the number of slats, which provide the ideal balance between adequate light and efficient shading.

The long heat period during the past July month showed that the choices made were also working effectively. The contractor, who was still finishing the building, could testify that the indoor temperature was very pleasant. Colleagues of his who were working on other construction sites even visited the school in the avenue of the Fire Cross to keep their heads cool during their consultation meetings...

ref. 15052.001

DBFM Fire Cross avenue passive school
Oops! Something went wrong while submitting the form.
15052.001

DBFM Fire Cross avenue passive school

In a Design & Build formula, the construction team Denys nv and BURO II & ARCHI I designed and built a sustainable school building in Neder-over-Beek. Ingenium designed all technical equipment and provided energy advice and dynamic simulations.

Client

Brussels City Council

‍Designer/Architect

BUROII & ARCHI I

‍Location

Neder-Over-Heembeek (Brussels)

Total construction cost

12,500,000 € excluding VAT

‍Budgettechniques

2,700,000 € excluding VAT

‍Surface.

9300 m²

Period Study

2015-09 - 2016-04

‍PeriodImplementation

2016-05 - 2018-08

Services
No items found.
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school
DBFM Fire Cross avenue passive school

DBFM Fire Cross avenue passive school

In a Design & Build formula, the construction team Denys nv and BURO II & ARCHI I designed and built a sustainable school building in Neder-over-Beek. Ingenium designed all technical equipment and provided energy advice and dynamic simulations.

The site includes a school for over 300 preschoolers and a school for just under 600 elementary school students, each with its own janitor's house and refectory, but with a common kitchen and gymnasium. The latter will also be open to local residents. Building owner the City of Brussels opted for a Design & Build formula, involving the main contractor and subcontractors early on in the project. Because the city's climate requirements were stringent, Ingenium opted for a passive school concept. The high airtightness of the building, a BTES with heat pump, system D ventilation, triple glazing, thorough insulation in the exterior walls and a green roof ensure optimum control of the indoor climate. Overheating was a particular concern. The indoor temperature is allowed to exceed 25 degrees for no more than 5 percent of the annual usage time. Ingenium provided blinds on the 3 solar sides. Instead of exterior screens, roof overhangs and wooden slats on the windows were chosen. Dynamic simulations for the most critical classrooms determined the number of slats, which provide the ideal balance between adequate light and efficient shading.

The long heat period during the past July month showed that the choices made were also working effectively. The contractor, who was still finishing the building, could testify that the indoor temperature was very pleasant. Colleagues of his who were working on other construction sites even visited the school in the avenue of the Fire Cross to keep their heads cool during their consultation meetings...

ref. 15052.001

DBFM Fire Cross avenue passive school

Related projects

KU Leuven O&N1 phase 1

KU Leuven O&N1 phase 1
In the spotlight

Saint Bavo Humanities

Saint Bavo Humanities
In the spotlight

Avant Jacob Jordaensstraat Energy Master Plan Study

Avant Jacob Jordaensstraat Energy Master Plan Study
In the spotlight

Fossil-free school buildings City of Ghent

Fossil-free school buildings City of Ghent
In the spotlight

Large-scale rollout of PV panels GO!

Large-scale rollout of PV panels GO!
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Brepol's Defossilization

Brepol's Defossilization
In the spotlight

GO! School group potential scan

GO! School group potential scan
In the spotlight

GO! Casinoplein Ghent: comfort simulations

GO! Casinoplein Ghent: comfort simulations
In the spotlight

KU Leuven campus R&N feasibility study fossil-free

KU Leuven campus R&N feasibility study fossil-free
In the spotlight

New Naval School Antwerp

New Naval School Antwerp
In the spotlight

VUB - renovation of chemical laboratories

VUB - renovation of chemical laboratories
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.