UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Leuven campus Gasthuisberg needed to update its energy plan for the period 2022-2026. Ingenium drafted the initial energy plan in 2006 and has since updated it 3 times (2010, 2014 and 2018). Ingenium was also appointed for this new update.

Client

UZ Leuven

Location

Leuven

Budget study

approx. 20,000 € excluding VAT

Period Study

2022

UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Leuven campus Gasthuisberg needed to update its energy plan for the period 2022-2026. Ingenium drafted the initial energy plan in 2006 and has since updated it 3 times (2010, 2014 and 2018). Ingenium was also appointed for this new update.

The focus included an update of measures from previous updates, a large-scale boiler room renovation, recovery of a number of existing waste heat flows (directly and via heat pumps), lowering the temperature of sanitary hot water production and distribution, relighting rojects and large-scale PV installations. The update was declared compliant before the Flemish Energy and Climate Agency.

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Leuven campus Gasthuisberg needed to update its energy plan for the period 2022-2026. Ingenium drafted the initial energy plan in 2006 and has since updated it 3 times (2010, 2014 and 2018). Ingenium was also appointed for this new update.

Client

UZ Leuven

Location

Leuven

Budget study

approx. 20,000 € excluding VAT

Period Study

2022

UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Leuven campus Gasthuisberg needed to update its energy plan for the period 2022-2026. Ingenium drafted the initial energy plan in 2006 and has since updated it 3 times (2010, 2014 and 2018). Ingenium was also appointed for this new update.

The focus included an update of measures from previous updates, a large-scale boiler room renovation, recovery of a number of existing waste heat flows (directly and via heat pumps), lowering the temperature of sanitary hot water production and distribution, relighting rojects and large-scale PV installations. The update was declared compliant before the Flemish Energy and Climate Agency.

UZ Gasthuisberg Leuven - Energy plan update 2022.
Oops! Something went wrong while submitting the form.

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Leuven campus Gasthuisberg needed to update its energy plan for the period 2022-2026. Ingenium drafted the initial energy plan in 2006 and has since updated it 3 times (2010, 2014 and 2018). Ingenium was also appointed for this new update.

Client

UZ Leuven

Location

Leuven

Budget study

approx. 20,000 € excluding VAT

Period Study

2022

UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.
UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Gasthuisberg Leuven - Energy plan update 2022.

UZ Leuven campus Gasthuisberg needed to update its energy plan for the period 2022-2026. Ingenium drafted the initial energy plan in 2006 and has since updated it 3 times (2010, 2014 and 2018). Ingenium was also appointed for this new update.

The focus included an update of measures from previous updates, a large-scale boiler room renovation, recovery of a number of existing waste heat flows (directly and via heat pumps), lowering the temperature of sanitary hot water production and distribution, relighting rojects and large-scale PV installations. The update was declared compliant before the Flemish Energy and Climate Agency.

UZ Gasthuisberg Leuven - Energy plan update 2022.

Related projects

Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent
In the spotlight

Large-scale rollout of PV panels GO!

Large-scale rollout of PV panels GO!
In the spotlight

Vilvoorde Energy Vision Plan

Vilvoorde Energy Vision Plan
In the spotlight

Energy master plan region Sint-Pietersnieuwstraat and Overpoort Ghent

Energy master plan region Sint-Pietersnieuwstraat and Overpoort Ghent
In the spotlight

IVAGO waste heat valorization and feasibility study heat and steam network

IVAGO waste heat valorization and feasibility study heat and steam network
In the spotlight

Terhills Eisden energy strategy - DC grid and large-scale PV

Terhills Eisden energy strategy - DC grid and large-scale PV
In the spotlight

DC Microgrids for Sustainable Energy Supply in Togo

DC Microgrids for Sustainable Energy Supply in Togo
In the spotlight

Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno

 Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno
In the spotlight

Guidance on the participatory rollout of a heat network in the Ravenshout industrial park in Beringen

Guidance on the participatory rollout of a heat network in the Ravenshout industrial park in Beringen
In the spotlight

Research on collective heat system for social housing patrimony

Research on collective heat system for social housing patrimony
In the spotlight

Brepol's Defossilization

Brepol's Defossilization
In the spotlight

Soudal energy plan

Soudal energy plan
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.