SvM - The Labyrinth and the Winged Ghent
Ingenium collaborated on this project realized in a Design & Build concept.
Client
AG Real Estate HQ - Brussels
Designer / Architect
Stéphane Beel Architecten
Location
Ghent
Budget techniques
EUR 1,750,000 (excluding VAT).
Budget study
EUR 81,000 (excluding VAT)
Surface
4489 m²
Period Study
01/07/203 - 31/01/2014
Period Implementation
01/01/2015 - 01/09/2015
SvM - The Labyrinth and the Winged Ghent
This D&B project concerns a new construction of a secondary school in Ghent with class and subject rooms, refectory, multipurpose room and technical room and a sports hall. In addition, the project provides for the construction of environmental works including a covered playground, an open playground, a bicycle shed. From an energy point of view, we initially sought to optimize the building's envelope. Through a well-considered design, we were able to create a high-performance shell, which limits the energy requirements as much as possible. This was achieved by building compact, determining an optimal glass surface area, thorough insulation and attention to the detailing of the nodes, as well as the choice of efficient sun blinds for east, south and west orientations.
By creating a high-performance envelope, we can greatly reduce the energy demand for cooling and heating, even to the extent that acceptable comfort was created without the application of active cooling. School buildings are characterized by significant electricity consumption because of the energy for lighting and ventilation. A PV system should also generate the necessary free power here, in order to reduce these auxiliary currents to the maximum extent possible. In terms of K and E levels, the building scores K25 - E62.
Also bitten by
smart technology?
Join us to push boundaries and help make a difference in our industry-leading projects.