Client

AG Real Estate HQ - Brussels

Designer / Architect

Stéphane Beel Architecten

Location

Ghent

Budget techniques

EUR 1,750,000 (excluding VAT).

Budget study

EUR 81,000 (excluding VAT)

Surface

4489 m²

Period Study

01/07/203 - 31/01/2014

Period Implementation

01/01/2015 - 01/09/2015

SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent

SvM - The Labyrinth and the Winged Ghent

This D&B project concerns a new construction of a secondary school in Ghent with class and subject rooms, refectory, multipurpose room and technical room and a sports hall. In addition, the project provides for the construction of environmental works including a covered playground, an open playground, a bicycle shed. From an energy point of view, we initially sought to optimize the building's envelope. Through a well-considered design, we were able to create a high-performance shell, which limits the energy requirements as much as possible. This was achieved by building compact, determining an optimal glass surface area, thorough insulation and attention to the detailing of the nodes, as well as the choice of efficient sun blinds for east, south and west orientations.

By creating a high-performance envelope, we can greatly reduce the energy demand for cooling and heating, even to the extent that acceptable comfort was created without the application of active cooling. School buildings are characterized by significant electricity consumption because of the energy for lighting and ventilation. A PV system should also generate the necessary free power here, in order to reduce these auxiliary currents to the maximum extent possible. In terms of K and E levels, the building scores K25 - E62.

SvM - The Labyrinth and the Winged Ghent

SvM - The Labyrinth and the Winged Ghent

Ingenium collaborated on this project realized in a Design & Build concept.

Client

AG Real Estate HQ - Brussels

Designer / Architect

Stéphane Beel Architecten

Location

Ghent

Budget techniques

EUR 1,750,000 (excluding VAT).

Budget study

EUR 81,000 (excluding VAT)

Surface

4489 m²

Period Study

01/07/203 - 31/01/2014

Period Implementation

01/01/2015 - 01/09/2015

SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent

SvM - The Labyrinth and the Winged Ghent

This D&B project concerns a new construction of a secondary school in Ghent with class and subject rooms, refectory, multipurpose room and technical room and a sports hall. In addition, the project provides for the construction of environmental works including a covered playground, an open playground, a bicycle shed. From an energy point of view, we initially sought to optimize the building's envelope. Through a well-considered design, we were able to create a high-performance shell, which limits the energy requirements as much as possible. This was achieved by building compact, determining an optimal glass surface area, thorough insulation and attention to the detailing of the nodes, as well as the choice of efficient sun blinds for east, south and west orientations.

By creating a high-performance envelope, we can greatly reduce the energy demand for cooling and heating, even to the extent that acceptable comfort was created without the application of active cooling. School buildings are characterized by significant electricity consumption because of the energy for lighting and ventilation. A PV system should also generate the necessary free power here, in order to reduce these auxiliary currents to the maximum extent possible. In terms of K and E levels, the building scores K25 - E62.

SvM - The Labyrinth and the Winged Ghent
Oops! Something went wrong while submitting the form.

SvM - The Labyrinth and the Winged Ghent

Ingenium collaborated on this project realized in a Design & Build concept.

Client

AG Real Estate HQ - Brussels

Designer / Architect

Stéphane Beel Architecten

Location

Ghent

Budget techniques

EUR 1,750,000 (excluding VAT).

Budget study

EUR 81,000 (excluding VAT)

Surface

4489 m²

Period Study

01/07/203 - 31/01/2014

Period Implementation

01/01/2015 - 01/09/2015

SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent
SvM - The Labyrinth and the Winged Ghent

SvM - The Labyrinth and the Winged Ghent

This D&B project concerns a new construction of a secondary school in Ghent with class and subject rooms, refectory, multipurpose room and technical room and a sports hall. In addition, the project provides for the construction of environmental works including a covered playground, an open playground, a bicycle shed. From an energy point of view, we initially sought to optimize the building's envelope. Through a well-considered design, we were able to create a high-performance shell, which limits the energy requirements as much as possible. This was achieved by building compact, determining an optimal glass surface area, thorough insulation and attention to the detailing of the nodes, as well as the choice of efficient sun blinds for east, south and west orientations.

By creating a high-performance envelope, we can greatly reduce the energy demand for cooling and heating, even to the extent that acceptable comfort was created without the application of active cooling. School buildings are characterized by significant electricity consumption because of the energy for lighting and ventilation. A PV system should also generate the necessary free power here, in order to reduce these auxiliary currents to the maximum extent possible. In terms of K and E levels, the building scores K25 - E62.

SvM - The Labyrinth and the Winged Ghent

Related projects

Green Energy Park

Green Energy Park
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

Renovation of cooling plant lab building Zwijnaarde

Renovation of cooling plant lab building Zwijnaarde
In the spotlight

Framework contract UZ Brussel

Framework contract UZ Brussel
In the spotlight

Project ACCESS: Parking Keerdok City of Mechelen

Project ACCESS: Parking Keerdok City of Mechelen
In the spotlight

Rezoning monastery visitation Kraainem

Rezoning monastery visitation Kraainem
In the spotlight

AZ Sint-Jan: Mortuary renovation

AZ Sint-Jan: Mortuary renovation
In the spotlight

AZ Sint-Jan: Renovation orthopedics

AZ Sint-Jan: Renovation orthopedics
In the spotlight

AZ Sint-Jan: Renovation lab

AZ Sint-Jan: Renovation lab
In the spotlight

UZ Gasthuisberg Leuven - Power station O&N4

UZ Gasthuisberg Leuven - Power station O&N4
In the spotlight

UZ Brussel Laboratory of genetics

UZ Brussel Laboratory of genetics
In the spotlight

Also bitten by
smart technology?

Join us to push boundaries and help make a difference in our industry-leading projects.