La Lorraine Erpe Mere energy study phase 3

As a result of the master plan La Lorraine Erpe-Mere frozen bakery, as part of the preparation of the environmental permit, an Energy Study should be added to it.

AUDITOR

La Lorraine Bakery Group

LOCATION

Erpe-Mere

BUDGET TECHNIQUES

14,510 EUR (excluding VAT)

PERIOD OF STUDY AND IMPLEMENTATION

October 2023

Services
No items found.

La Lorraine Erpe Mere energy study phase 3

As a result of the master plan La Lorraine Erpe-Mere frozen bakery, as part of the preparation of the environmental permit, an Energy Study should be added to it.

This phase consists of building an additional high-rise freezer and picking department. In this department, the baked products are cooled, frozen and transported via a freezer corridor to the high-rise freezer. Ingenium is preparing this energy study according to Decision Energy Planning.

This energy study shows that La Lorraine Erpe-Mere will carry out the expansion with the Best Available Techniques (BAT). Ingenium advises and calculates energy-saving measures. Maximum use will be made of heat recovery for own use on the cooling installation. The energy consumption for this expansion is estimated at 0.174 PJprim.

At this stage, there is no expansion of fossil energy consumption.

Related projects

High Voltage 150 kV GIS + 22 kV MV

High Voltage 150 kV GIS + 22 kV MV
In the spotlight

High voltage 2x 150 kV / 13 kV

High voltage 2x 150 kV / 13 kV
In the spotlight

Preliminary design for a 36 kV high-voltage connection

Preliminary design for a 36 kV high-voltage connection
In the spotlight

KevlinX Data Center 36 kV High-Voltage Substation 2x40 MVA

KevlinX Data Center 36 kV High-Voltage Substation 2x40 MVA
In the spotlight

High-voltage feasibility study for 150 kV (Hitachi + Siemens)

High-voltage feasibility study for 150 kV (Hitachi + Siemens)
In the spotlight

High-voltage preliminary design for a 36 kV connection and pre-design layout

High-voltage preliminary design for a 36 kV connection and pre-design layout
In the spotlight

Preliminary design for a 36 kV high-voltage substation

Preliminary design for a 36 kV high-voltage substation
In the spotlight

Van der Vlist Zeebrugge

Van der Vlist Zeebrugge
In the spotlight

ECS/ 2XL High-rise 2

ECS/ 2XL High-rise 2
In the spotlight

Zeebrugge Green Logistics

Zeebrugge Green Logistics
In the spotlight

DEMATRA HIGH-RISE WAREHOUSE

DEMATRA HIGH-RISE WAREHOUSE
In the spotlight

SEW Eurodrive - new warehouses and offices

SEW Eurodrive - new warehouses and offices
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.

La Lorraine Erpe Mere energy study phase 3

As a result of the master plan La Lorraine Erpe-Mere frozen bakery, as part of the preparation of the environmental permit, an Energy Study should be added to it.

This phase consists of building an additional high-rise freezer and picking department. In this department, the baked products are cooled, frozen and transported via a freezer corridor to the high-rise freezer. Ingenium is preparing this energy study according to Decision Energy Planning.

This energy study shows that La Lorraine Erpe-Mere will carry out the expansion with the Best Available Techniques (BAT). Ingenium advises and calculates energy-saving measures. Maximum use will be made of heat recovery for own use on the cooling installation. The energy consumption for this expansion is estimated at 0.174 PJprim.

At this stage, there is no expansion of fossil energy consumption.

La Lorraine Erpe Mere energy study phase 3

As a result of the master plan La Lorraine Erpe-Mere frozen bakery, as part of the preparation of the environmental permit, an Energy Study should be added to it.

AUDITOR

La Lorraine Bakery Group

LOCATION

Erpe-Mere

BUDGET TECHNIQUES

14,510 EUR (excluding VAT)

PERIOD OF STUDY AND IMPLEMENTATION

October 2023

Services
No items found.
Sectors

La Lorraine Erpe Mere energy study phase 3

As a result of the master plan La Lorraine Erpe-Mere frozen bakery, as part of the preparation of the environmental permit, an Energy Study should be added to it.

This phase consists of building an additional high-rise freezer and picking department. In this department, the baked products are cooled, frozen and transported via a freezer corridor to the high-rise freezer. Ingenium is preparing this energy study according to Decision Energy Planning.

This energy study shows that La Lorraine Erpe-Mere will carry out the expansion with the Best Available Techniques (BAT). Ingenium advises and calculates energy-saving measures. Maximum use will be made of heat recovery for own use on the cooling installation. The energy consumption for this expansion is estimated at 0.174 PJprim.

At this stage, there is no expansion of fossil energy consumption.