AZ Sint-Lucas Ghent - Construction project block G

This subproject of the master plan involves the renovation of the facade and the thorough conversion of levels 1 through 4 of Block G into consultation wards.

Location

Ghent

Budget techniques

2,139,077.43 € excluding VAT

Surface

15.825 m²

Period Study

01-2015 - 04-2015

Period Implementation

05-2015 - 12-2016

Final delivery

07-2017

Services
No items found.
Sectors
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G

AZ Sint-Lucas Ghent - Construction project block G

This subproject of the master plan involves the renovation of the facade and the thorough conversion of levels 1 through 4 of Block G into consultation wards.

It was possible to build on the existing ducts and technical space, which were already realized in 2005 during the remodeling and expansion of the ground floor for the radiotherapy department.

Ingenium was responsible for the study and follow-up during execution of the plots of Electricity, HVAC, Plumbing & Fire Protection, as well as EPB reporting.

AZ Sint-Lucas Ghent - Construction project block G

AZ Sint-Lucas Ghent - Construction project block G

This subproject of the master plan involves the renovation of the facade and the thorough conversion of levels 1 through 4 of Block G into consultation wards.

Location

Ghent

Budget techniques

2,139,077.43 € excluding VAT

Surface

15.825 m²

Period Study

01-2015 - 04-2015

Period Implementation

05-2015 - 12-2016

Final delivery

07-2017

Services
No items found.
Sectors
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G

AZ Sint-Lucas Ghent - Construction project block G

This subproject of the master plan involves the renovation of the facade and the thorough conversion of levels 1 through 4 of Block G into consultation wards.

It was possible to build on the existing ducts and technical space, which were already realized in 2005 during the remodeling and expansion of the ground floor for the radiotherapy department.

Ingenium was responsible for the study and follow-up during execution of the plots of Electricity, HVAC, Plumbing & Fire Protection, as well as EPB reporting.

AZ Sint-Lucas Ghent - Construction project block G
Oops! Something went wrong while submitting the form.

AZ Sint-Lucas Ghent - Construction project block G

This subproject of the master plan involves the renovation of the facade and the thorough conversion of levels 1 through 4 of Block G into consultation wards.

Location

Ghent

Budget techniques

2,139,077.43 € excluding VAT

Surface

15.825 m²

Period Study

01-2015 - 04-2015

Period Implementation

05-2015 - 12-2016

Final delivery

07-2017

Services
No items found.
Sectors
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G
AZ Sint-Lucas Ghent - Construction project block G

AZ Sint-Lucas Ghent - Construction project block G

This subproject of the master plan involves the renovation of the facade and the thorough conversion of levels 1 through 4 of Block G into consultation wards.

It was possible to build on the existing ducts and technical space, which were already realized in 2005 during the remodeling and expansion of the ground floor for the radiotherapy department.

Ingenium was responsible for the study and follow-up during execution of the plots of Electricity, HVAC, Plumbing & Fire Protection, as well as EPB reporting.

AZ Sint-Lucas Ghent - Construction project block G

Related projects

The High Souls

The High Souls
In the spotlight

Antwerp University Hospital - master plan energy building

Antwerp University Hospital - master plan energy building
In the spotlight

Energy audit of AZ Sint-Lucas Ghent

Energy audit of AZ Sint-Lucas Ghent
In the spotlight

Master plan for energy and water facilities UZA

Master plan for energy and water facilities UZA
In the spotlight

High-rise Nobel 1 UZ Gent

High-rise Nobel 1 UZ Gent
In the spotlight

Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno

 Integration of an AC Microgrid with Battery or Emergency Generator in Island and Grid-connected Operation - AZ Zeno
In the spotlight

AZ Sint Jan Bruges - new therapy pool construction

AZ Sint Jan Bruges - new therapy pool construction
In the spotlight

Master plan Energy UZ Gasthuisberg Leuven

Master plan Energy UZ Gasthuisberg Leuven
In the spotlight

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power

ZOL Genk Campus Sint-Jan: Master plan for electrical distribution and emergency power
In the spotlight

WZC Waegebrughe Kruisem

WZC Waegebrughe Kruisem
In the spotlight

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates
In the spotlight

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno

Feasibility studies, design and supervision of implementation of PV installations, charging infrastructure and flexibility at AZ Zeno
In the spotlight

Also bitten by
smart technology?

Come push boundaries with us and help make a difference in our industry-leading projects.