UZ Leuven Campus Gasthuisberg Energy plan and updates

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all the buildings located on the Gasthuisberg site and managed by UZ Leuven.

Client

UZ Leuven

Location

Leuven

Period of study

2006 - 2010 - 2014 - 2016 - 2018 - 2022

UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all the buildings located on the Gasthuisberg site and managed by UZ Leuven.

This energy plan was updated every 4 years. The drawing up of this energy plan and the 4-yearly update is mandatory because UZ Leuven, campus Gasthuisberg is an energy-intensive site (current definition: final annual energy consumption greater than 0.1 PJ).

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all buildings on the Gasthuisberg site and under the management of UZ Leuven. The energy plan was drawn up in accordance with the Energy Plan Decree and was declared compliant by the VEKA (Flemish Energy and Climate Agency). It includes a global study and detailed studies of the various buildings and installations for HVAC and electricity.

Every four years (2010, 2014, 2018 and 2022), the energy plan was successfully updated by Ingenium and declared compliant by VEKA. These updates include each time a reporting of the changes to all buildings and installations since the previous update, a detailed analysis of the energy consumption and a comparison with the previous updates of the energy plan, the updating of all measures from the previous energy plans that were not implemented, and the technical and financial calculation of various new energy-saving measures.

Cost-effective measures must be mandatorily implemented by the hospital.

Some of the measures calculated over the years: building envelope measures, control optimizations, lighting measures (relighting, control,...), steam optimizations, optimization of cooling and heating plants, heat pump strategies, renovation strategies of the various HVAC plants, integration of renewable energy,...

UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all the buildings located on the Gasthuisberg site and managed by UZ Leuven.

Client

UZ Leuven

Location

Leuven

Period of study

2006 - 2010 - 2014 - 2016 - 2018 - 2022

UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all the buildings located on the Gasthuisberg site and managed by UZ Leuven.

This energy plan was updated every 4 years. The drawing up of this energy plan and the 4-yearly update is mandatory because UZ Leuven, campus Gasthuisberg is an energy-intensive site (current definition: final annual energy consumption greater than 0.1 PJ).

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all buildings on the Gasthuisberg site and under the management of UZ Leuven. The energy plan was drawn up in accordance with the Energy Plan Decree and was declared compliant by the VEKA (Flemish Energy and Climate Agency). It includes a global study and detailed studies of the various buildings and installations for HVAC and electricity.

Every four years (2010, 2014, 2018 and 2022), the energy plan was successfully updated by Ingenium and declared compliant by VEKA. These updates include each time a reporting of the changes to all buildings and installations since the previous update, a detailed analysis of the energy consumption and a comparison with the previous updates of the energy plan, the updating of all measures from the previous energy plans that were not implemented, and the technical and financial calculation of various new energy-saving measures.

Cost-effective measures must be mandatorily implemented by the hospital.

Some of the measures calculated over the years: building envelope measures, control optimizations, lighting measures (relighting, control,...), steam optimizations, optimization of cooling and heating plants, heat pump strategies, renovation strategies of the various HVAC plants, integration of renewable energy,...

UZ Leuven Campus Gasthuisberg Energy plan and updates
Oops! Something went wrong while submitting the form.

UZ Leuven Campus Gasthuisberg Energy plan and updates

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all the buildings located on the Gasthuisberg site and managed by UZ Leuven.

Client

UZ Leuven

Location

Leuven

Period of study

2006 - 2010 - 2014 - 2016 - 2018 - 2022

UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates
UZ Leuven Campus Gasthuisberg Energy plan and updates

UZ Leuven Campus Gasthuisberg Energy plan and updates

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all the buildings located on the Gasthuisberg site and managed by UZ Leuven.

This energy plan was updated every 4 years. The drawing up of this energy plan and the 4-yearly update is mandatory because UZ Leuven, campus Gasthuisberg is an energy-intensive site (current definition: final annual energy consumption greater than 0.1 PJ).

In 2006, Ingenium was commissioned by UZ Leuven to draw up the energy plan for all buildings on the Gasthuisberg site and under the management of UZ Leuven. The energy plan was drawn up in accordance with the Energy Plan Decree and was declared compliant by the VEKA (Flemish Energy and Climate Agency). It includes a global study and detailed studies of the various buildings and installations for HVAC and electricity.

Every four years (2010, 2014, 2018 and 2022), the energy plan was successfully updated by Ingenium and declared compliant by VEKA. These updates include each time a reporting of the changes to all buildings and installations since the previous update, a detailed analysis of the energy consumption and a comparison with the previous updates of the energy plan, the updating of all measures from the previous energy plans that were not implemented, and the technical and financial calculation of various new energy-saving measures.

Cost-effective measures must be mandatorily implemented by the hospital.

Some of the measures calculated over the years: building envelope measures, control optimizations, lighting measures (relighting, control,...), steam optimizations, optimization of cooling and heating plants, heat pump strategies, renovation strategies of the various HVAC plants, integration of renewable energy,...

UZ Leuven Campus Gasthuisberg Energy plan and updates

Related projects

afvalverbrandingscentrale UVE Virginal

afvalverbrandingscentrale UVE Virginal
In the spotlight

Routeplan klimaatneutrale stadsgebouwen Brugge

Routeplan klimaatneutrale stadsgebouwen Brugge
In the spotlight

Role Province of East Flanders in mini-heat grid development

Role Province of East Flanders in mini-heat grid development
In the spotlight

Heat district Groot-Begijnhof Mechelen

Heat district Groot-Begijnhof Mechelen
In the spotlight

Geothermal energy on public domain City of Antwerp

Geothermal energy on public domain City of Antwerp
In the spotlight

The Bijloke site in Ghent: an energetic transformation for a sustainable future

The Bijloke site in Ghent: an energetic transformation for a sustainable future
In the spotlight

Research sustainable heat sources for heat networks in Bruges

Research sustainable heat sources for heat networks in Bruges
In the spotlight

Energy master plan for large-scale renovation of Cinquantenaire Park and museums

Energy master plan for large-scale renovation of Cinquantenaire Park and museums
In the spotlight

Feasibility studies, design and supervision of implementation of PV installations at AZ Zeno

Feasibility studies, design and supervision of implementation of PV installations at AZ Zeno
In the spotlight

La Lorraine Erpe Mere energy study phase 3

La Lorraine Erpe Mere energy study phase 3
In the spotlight

BatHyBuild study

BatHyBuild study
In the spotlight

Also bitten by
smart technology?

Join us to push boundaries and help make a difference in our industry-leading projects.