27/10/2021
Nieuwe maatschap DEVI levert bouwkundig totaalontwerp voor industriële projecten
Met de maatschap DEVI slaan 4 ervaren West-Vlaamse spelers in de bouwsector de handen in elkaar om sterker te staan in grote industriële (ver)bouwprojecten van Belgische en buitenlandse opdrachtgevers. “Onze klanten zijn technische mensen. Wij zijn dat ook. Zo is er snel wederzijds begrip”, vertellen Frederik Moortgat (Establis) en Bart Verplancke (Industrium).
Het volledige artikel kan je hieronder downloaden.
Voor meer info kan je terecht bij Bart Verplancke: 050/40 45 30 of via bart.verplancke@industrium.be.
Related news items
in the spotlight
Strategy and energy master plan
21/4/2023
General contractor Alheembouw is in charge of the execution of the lot closed shell construction and environmental construction. Industrium is collaborating in this project with Architectenbureau Dugardyn, Establis, and Studiebureau Verhaeghe & Partners, within the partnership DEVI. Vanheede Environment Group is assisted by DEVI in the design of the entire site, and in execution takes the lead in coordinating the Techniques lot.
in the spotlight
Technical building installations
2/6/2023
New construction of SEW-Eurodrive in Haasrode is CO2 neutral
SEW-EURODRIVE is a German multinational company operating in 52 countries worldwide with more than 19,000 employees. The company produces electric motors, (motors for) gearboxes, gearboxes and other components for vehicles, machines and production lines. Haasrode is 1 of 4 Belgian locations. At Brabanthal - one and a half kilometers from the new building site - the company already has a site.
in the spotlight
Smart grids, charging infrastructure and energy sharing
13/8/2024
Large-scale electric vehicle charging infrastructure - invest smart and forward-looking
Flanders decided that from 2026 only fossil-free company cars - fully electric or hydrogen-powered - will be tax deductible. A leased car running on diesel or gasoline will be deductible at 0%. In addition, buildings that are not for residential use and have a minimum number of parking spaces will have to provide charging stations for electric vehicles immediately by 2025 or even in new construction or major renovations.